BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 9, 2025 at 8:00 PM

Updated April 10, 2025

Site work for a water / sewer project in Flowery Branch, Georgia. Completed plans call for site work for a water / sewer project.

No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days. 2. Work To Be Done: The Work to be completed for the Summit Lake Stormwater Rehabilitation is described briefly as follows: The proposed improvements include but are not limited to: In-place rehabilitation of approx. 150 LF of existing storm drainage pipe via cleaning & debris removal and cured-in-place pipe installation. Any other questions can be directed to the issuing office, ESG Engineering LLC. Attn. Margaret Hildebrand, margaret.hildebrand@esgengineering.com or 478-474-4996. Contractor License: Any Contractor submitting a bid must hold an active utility contractor's license issued by the State of Georgia. 5. Funding: This project will be funded using local funds. 6. No permits are required for the construction of this project. 7. Reservation of Rights: Owner reservesthe right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids, and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.

Post-Bid

Water / Sewer

$1,230,000.00

Public - City

Site Work

3

6

8

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
314
Active Projects
197
Bidding Soon
2,280
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

May 26, 2025

Project location map

Multiple Locations, Flowery Branch, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.