Published April 17, 2025 at 8:00 PM

Updated April 18, 2025

Site work, paving and new construction of a civil project in Whitehouse, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and for the construction of a water / sewer project.

The project includes: Coordination and facilitation of a new electric utility service, construction of a new electrical and controls building, installation of new electrical gear and variable frequency drives, installation of a standby generator, replacement of conduit and wire for facility raw water pumps and instrumentation, installation and integration of SCADA infrastructure, replacement of pump discharge and transmission line valves, replacement of transmission line flow meter, and construction of miscellaneous site improvements including fencing, gates, pavements, utility relocations, drainage, and lighting. Question Deadline 04/03/2025 Questions concerning this project shall be directed to Blake Bogenschutz, P.E., 903- 581-8141 Submit questions for this project 72-hours prior to bid opening through Civcast Q&A portal. 1. Coordination and facilitation of new utility electric service. 2. Construction of new 4160-vac transformer and metering foundations and apurtenances to facilitate new utiliity electric service. 3. Construction of a new electrical and controls building. 4. Installation of new medium voltage electrical gear and variable frequency drives (VFDs) for the three (3) existing raw water pumps. 5. Installation of a new standby generator and automatic transfer functionaliity capable of powering one (1) existing raw water pump. 6. Construction of a new 480-vac transformer, foundation, and appurtenances. 7. Installation of new low voltage power and lighting distribution gear and associated conduit and cable. 8. Construction of two (2) new air handling units, foundations, and appurtenances. 9. Removal and replacement of conduit and wire for each of the three (3) existing raw water pumps and facility instrumentation. 10. Reconnection of existing power and lighting distribution equipment to new electric distribution gear. 11. Installation of SCADA remote terminal unit (RTU) for remote control of the raw water pumps. 12. Removal and replacement of raw water pump discharge check and butterfly valves for each of the three (3) existing raw water pumps. 13. Removal and replace of raw water transmission line pressure relief and sustaining valve, surge anticipator valve, butterfly valves, and drain valves. 14. Blasting and painting of all pump discharge heads, flanged piping, valves, and fittings. 15. Removal and replacement of raw water transmission line flow meter. 16. Construction of miscellaneous site improvements including fencing, manual and automatic gates, pavements, waterline relocations, valley gutter and storm sewer drainage, lighting, etc. Calendar Days: 1,080 Final Completion Liquidated Damages: Refer to Article 16.12.3 of the General Conditions Estimate: $10M - $12M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$9,932,780.00

Public - City

New Construction, Paving, Site Work

42

42

7

7

Subscribe For Documents

62 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
63
Bidding Soon
676
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

June 2, 2025

Project location map

16520 McElroy Rd, Whitehouse, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.