BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 22, 2025 at 8:00 PM

Updated April 24, 2025

Site work and paving for a road / highway in Bloomer, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of April 22, 2025, the project was awarded to Senn Blacktop Inc, with an awarded amount of $ 229,992,80.** The Town of Cooks Valley will accept bids for base coarse, pulverizing, paving, and shouldering on Cooks Valley Town roads 40th St. south from 150th Ave to 135th Ave,. Total length is approximately 8300 feet by 20 ft. in width. Please check distances for accuracy. Specifications include: o 40th St. approximately 8300 ft. in length o Pulverizing of old road bed and inject Aggregate Base Stabilizer or pulverize with some added 11/4 inch base. o Paving 2 1/2 inches compacted depth 2-10 foot lanes with 3% slope from center with driveway and mailbox bump outs. o Shouldering 3/4 inch gravel 2 foot wide compacted both sides of road including driveway leveling o 3 inches of 1 1/4 inch base coarse compacted 24 ft wide . See bid form for complete details. The Town Board reserves the right to reject any or all bids or parts of bids and accept the bid most advantageous to the township. Completion date will be negotiated at the time of contract award. For further information, contact Chairman Darrel Fehr at [715] 829 2311 or email cv1927@bloomer.net. Project Site and Scope of Work 40 th Street Town of Cooks Valley T30N, R10W, Section 21-22-27-28-33-34 . The work under this contract shall consist of pulverize, injection of aggregate stabilizer, relay and compaction of pulverized material, sawing of pavement on 40th St intersection with 150th Ave and 135 th Ave intersection with 40th St where pavement change and all paved driveways (2ft .bump out) along roadway, final grading, prepare foundation for asphaltic paving and apply asphaltic surface on various roadways in Town of Cooks Valley. Roadway approximate dimentions are as follows:. 40 th St starting at 150 th Ave then south to 135th Ave..approcimate 8300 ft in length and 20 ft. wide..

Award

Roads / Highways

$229,993.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
44
Bidding Soon
617
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2025

April 23, 2025

Project location map

40th St, Bloomer, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.