BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 18, 2025 at 8:00 PM

Updated April 19, 2025

Demolition, site work, paving and new construction of a civil project in Bloomer, Wisconsin. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

20250408026. 8907-00-72 WISC 2025432 T Bloomer, 190th Avenue, Br Duncan Creek Bridge B-09-0311, LOC STR Chippewa County Work Summary: Removals, Grading, Aggregate, Asphalt Pavement, Structure Replacement, Erosion Control, Permanent Signing, Traffic Control, Restoration. Work Type: AF DBE Goal: 3% Working Day Contract: 40 Days Guaranty Required: $20,000.00 Estimate Anticipated Funding $250,000 - $499,999 With each sealed proposal, the bidder must include a properly executed bid bond or a cashier's check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. Unless otherwise specified in this advertisement, the Department will issue bidding proposals only to those who have established their qualifications for the work to be bid upon. Any prospective bidder who has not established their qualifications must file a sworn statement with the Department not less than TEN business days prior to the time set for submitting bidding proposals on a form furnished by the Department. The Department will evaluate this statement and will issue bidding proposals as it deems warranted. Question Deadline 04/03/2025 at 11:45 AM CT Questions will be allowed up to 11:45 a.m. the day before the letting, however any question submitted after 2 p.m. the Thursday prior to the letting may not have sufficient time to prepare a thorough response or develop a contract addenda. WIDOT - 026 - T Bloomer, 190th Avenue *the Value for This Project is Based on a Financial Range. The Value is Listed as the Highest Possible Cost From the Range Provided by a Stakeholder or Official Project Document.

Award

Bridges / Tunnels

$444,803.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

46

4

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
55
Bidding Soon
618
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

May 8, 2025

Project location map

190th Ave, Bloomer, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.