Published March 13, 2025 at 8:00 PM
Updated October 1, 2024
Site work for a water / sewer project in Elgin, Illinois. Completed plans call for site work for a water / sewer project.
An original bid bond (in the amount of 5% of the original bid amount) must be delivered to the City of Elgin Purchasing Department, 150 Dexter Court no later than 12:00 PM on April 24, 2025, which sum shall be forfeited in case the successful bidder fails to enter into a binding contract and provide a properly executed contract and surety bond within 15 days after the date the contract is awarded by the City. The scope of work consists of approximately 221 full lead service line replacements from water main to interior water meter, and all other appurtenant work and materials necessary to complete the project throughout the City of Elgin as set forth in the bid documents. The successful bidder shall be required to furnish a satisfactory contract bond to the City of Elgin by a surety company authorized to do business in the State of Illinois covering the full amount of the contract. The successful bidder and all sub-contractors shall be required to conform to the labor standards set forth in the Contract Documents. The successful bidder shall pay prevailing wage and shall provide certified payrolls to the City for the duration of the project. This project must comply with the Elgin Responsible Bidders Ordinance and the Illinois Works Jobs Program Act (Apprenticeship Initiative) [30 ILCS 559/20/20-1]. Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a loan from the Illinois Environmental Protection Agency (Illinois EPA). Neither the State of Illinois nor any of its departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. The procurement will be subject to regulations contained in the Procedures for Issuing Loans from the Public Water Supply Loan Program (35IAC Part 662), the Davis-Bacon Act (40 USC 276a through 276a-5) as defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570), Illinois Works Jobs Program Act (30 ILCS 559/20-1), and the federal "Build America, Buy America Act" requirements contained in the Infrastructure Investment and Jobs Act, Pub. L. No. 117-58. This procurement is also subject to the loan recipient's policy regarding the increased use of disadvantaged business enterprises. The loan recipient's policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. The policy is contained in the specifications. Bidders are also required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in 41 CFR 60-4. The bidder shall submit, if requested by the City, a list of qualified references for projects of similar size and scope of this project. Proposals withdrawn may not be resubmitted at the same letting. Each bidder shall satisfy the City as to their ability, financially or otherwise, to carry out the work. The right is reserved to reject any or all bids or to waive technicalities and any informality in any bid. Questions regarding the bidding process or bidding software can be directed to Nick Etminan, Purchasing Officer at (847) 931-5606 or nickon.etminan@elginil.gov. Questions regarding this bid package can be directed to Timo Bello, Utilities Superintendent, by email at timo.bello@elginil.gov. Technical questions regarding the scope of work should be addressed to Julie Morrison at Engineering Enterprises, Inc. at jmorrison@eeiweb.com no later than March 28th, 2025, at 4:00 pm. The City reserves the right to waive any Bid informalities. The City may permit bidders who fail to include forms not otherwise required by law to cure such omission(s) within five days of bid opening, in the City's sole discretion. Any Bidder who fails to execute a contract and furnish applicable bonds shall forfeit its Bid deposit which shall become the property of the City. The amount retained by the City shall not exceed the difference between the lowest Bid price and the Bid price of the next lowest responsible and eligible bidder. The City shall notify the selected Bidder and all other Bidders of the award. The City shall submit to the selected Bidder a Notice of Award and at least four (4) unsigned copies of the Agreement between the City and the Contractor. The Bidder shall return all executed copies of the Agreement, all bonds and insurance certificates to the City's Purchasing Director within 10 Business Days of the notice of the notice of award. The selected bidder will be required to furnish a Contract Bond equal to one hundred percent (100%) of the total contract price in accordance with the provisions stated in the Information for Bidders. The work shall be substantially completed by December 31st, 2025, and fully completed by June 1 st , 2026. Substantial completion is defined as completion of all work with the exception of final restoration. If any conflict exists between the date provided in the Agreement and these instructions, the Agreement shall prevail. Selected Bidder shall also pay as liquidated damages the sum of $1,425 for each consecutive calendar day thereafter the work remains unfinished. Selected Bidder agrees that such liquidated damages constitute a reasonable, good faith estimate of damages actually incurred by the City and do not constitute a penalty. Such aforementioned liquidated damages shall constitute the sole recourse for the City for violation of this paragraph.
GC Bidding
Water / Sewer
$100,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 04 - Masonry
Division 09 - Finishes
Division 10 - Specialties
Division 14 - Conveying Equipment
Division 23 - Heating Ventilating and Air Conditioning
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 24, 2025
May 23, 2025

Multiple Locations, Elgin, IL
Related To This Project
Elgin, IL
Bid Date: Apr 22 2025
Elgin, IL
Bid Date: Mar 27 2025
Elgin, IL
Bid Date: Apr 10 2025
Elgin, IL
Bid Date: Mar 19 2025
Elgin, IL
Bid Date: Apr 03 2025
Elgin, IL
Bid Date: Apr 03 2025
Elgin, IL
Bid Date: Apr 08 2025
Elgin, IL
Bid Date: May 07 2025
Elgin, IL
Bid Date: Mar 25 2025
Elgin, IL
Bid Date: Apr 14 2025
Elgin, IL
Bid Date: Mar 25 2025
Elgin, IL
Bid Date: Mar 25 2025
Elgin, IL
Bid Date: Mar 06 2025
Elgin, IL
Bid Date: Mar 13 2025
Elgin, IL
Bid Date: Mar 13 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.