Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 9, 2025 at 8:00 PM
Updated June 10, 2025
Site work, paving, outdoor lighting and new construction of a mixed-use development in Alpena, Michigan. Completed plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and for outdoor lighting for a sidewalk / parking lot.
https://www.thealpenanews.com/news/local-news/2025/04/projects-begin-around-alpena/ The project to renovate Culligan Plaza is still slated to begin this spring, as city officials will review bids for the project, which then have to be reviewed by the state, and then approved by the council, maybe as early as the end of May. The Culligan Plaza project also includes a renovation of the parking lot and construction of a new restroom facility downtown. ---------------------------------------------------- This project has an estimated budget of $1,185,550. Due to the funding source, the project must be completed by November 1, 2025. The City of Alpena reserves the right to reject any or all Bids or to waive any informality in the bidding. Bids may be held by the City of Alpena for a period not to exceed 30 days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract. Questions regarding the project or request to be included on the upcoming bid list, please contact our office at engineer@alpena.mi.us A certified check or bank draft, payable to the order of City of Alpena, negotiable U.S. Government bonds (at par value) or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Bid shall be submitted with each Bid. The project involves reconstruction of an existing plaza in downtown Alpena. This will include repair to an adjacent parking lot and installation of a new restroom facility. Architectural renderings for the project are attached for reference only. Bids are invited upon the several items and quantities of work as follows: Item 1. Demolition of the Culligan Plaza and adjacent parking lot which will include approximately 2,000 cyds of earth excavation, removal of 380 feet of four-foot masonry barrier wall and 36-inch footing, and removal of an existing fountain basin including 36-inch footing. Item 2. Construction of a new water feature, fire feature and stage area. Installation of approximately 1500 sft of concrete sidewalk, 1500 feet of stenciled sidewalk, HMA surface repairs to the adjacent sidewalk. Landscaping items include installation of three tree boxes used for storm water runoff, approximately 1,000 sft of rain garden integrated into the water feature, and several 4" caliper trees. Additionally, there will be items of work for lighting, electrical services, utility services, and stage sound system. Item 3. Construction of a new two-unit family restroom with mechanical room. This building will be masonry construction.
Award
Playgrounds / Parks / Athletic Fields
$1,081,835.00
Public - City
New Construction, Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 29, 2025
May 15, 2025
To Be Determined, Alpena, MI
Related To This Project
Alpena, MI
Bid Date: Mar 14 2025
Alpena, MI
Bid Date: May 08 2025
Alpena, MI
Bid Date: Apr 07 2025
Alpena, MI
Bid Date: Sep 13 2021
Alpena, MI
Bid Date: Jun 10 2025
Alpena, MI
Bid Date: Jun 16 2025
Alpena, MI
Bid Date: Sep 04 2025
Alpena, MI
Bid Date: Feb 25 2025
Alpena, MI
Bid Date: Feb 17 2025
Alpena, MI
Bid Date: Jan 14 2025
Alpena, MI
Bid Date: Jan 21 2025
Alpena, MI
Bid Date: Jan 14 2025
Alpena, MI
Bid Date: Mar 24 2025
Alpena, MI
Bid Date: Jan 08 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
