Site work for a water / sewer project in Rib Lake, Wisconsin. Completed plans call for site work for a water / sewer project.
The work for which bids are asked includes the following: Repainting of an existing 200,000 gallon single pedestal steel spheroid water tank including complete removal and replacement of the wet interior surfaces, dry interior and exterior surfaces. The work will require the installation of a temporary containment system, temporary water pressure system, and miscellaneous structural improvement The anticipated substantial completion date is September 14, 2025. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. 1230 South Boulevard, Baraboo, WI 53913. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with Federal Davis Bacon Wage Rates This project anticipates use of Wisconsin DNR Safe Drinking Water Loan Program OR Clean Water Fund Program funding. We encourage Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), and Women's Business Enterprises (WBEs) to submit bid proposals. A municipality, in awarding prime contracts, and the primary engineer and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE/WBE utilization in accordance with s.NR 162.09(3), s.NR 166.12(4), and s.NR 167.18(4) Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. The Contractor shall conform to the "Use of American Iron and Steel" provision of H.R. 3547 Consolidated Appropriations Act, 2014, section 436, including all iron and steel products used in the project. Bid Proposals may be denied if the requirements of this section are not met and waivers are required. OWNER reserves the right to waive any informalities or to reject any or all bids. Question Deadline 03/18/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by ENGINEER as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered
Award
Water / Sewer
$520,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
25
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2025
May 1, 2025
To Be Determined, Rib Lake, WI
Related To This Project
Rib Lake, WI
Bid Date: Apr 09 2025
Rib Lake, WI
Bid Date: May 13 2025
Rib Lake, WI
Bid Date: Mar 30 2026
Rib Lake, WI
Bid Date: Jan 30 2025
Rib Lake, WI
--
Rib Lake, WI
--
Rib Lake, WI
Bid Date: Jun 24 2024
Rib Lake, WI
Bid Date: Apr 10 2024
Rib Lake, WI
--
Rib Lake, WI
Bid Date: Jun 06 2022
Rib Lake, WI
Bid Date: Mar 10 2022
Rib Lake, WI
Bid Date: Jan 11 2022
Rib Lake, WI
Bid Date: Jul 11 2023
Rib Lake, WI
Bid Date: Jun 08 2022
Rib Lake, WI
Bid Date: Apr 13 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.