Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 10, 2026 at 8:00 PM
Updated August 12, 2026
Site work and renovation of a development in Rib Lake, Wisconsin. Completed plans call for the renovation of a development; and for site work for a development.
Improvement of 0.99 miles of woods road including road-bed grading, excavator work, culvert installation, and stump removal. The goal of this project is to improve approximately 0.99 miles of existing forest road to accommodate log truck traffic. The project area is described on the attached map. Large trees within the project ROW have been cleared. Some additional brushing or minor tree removal may be necessary to complete the project. The general specifications are as follows. The entire forest road length shall be leveled/shaped with a dozer and excavator to control water and provide a proper base to support traffic. Where necessary, diversion ditches, broad based dips, and water bars shall be constructed. Hills shall be cut to reduce slope and sharp corners shall be straightened as needed to allow for the passage of trucks. Soil removed from the roadbed and from uplands adjacent to the road shall be borrowed and moved to other parts of the road as needed to meet specifications . No fill or debris may be deposited outside of the existing road grade in wetland areas. The finished driving surface shall be at least 14 feet in width. This will require the removal of stumps in the roadway and adjacent ditches, and the sloping of banks and ditches to allow water to drain away from the roadway. Approximately 700 linear feet of the project will be new road and will require additional stump removal and earthwork to meet the final specification. The finished roadbed must be graded relatively smooth and evenly packed (via trucks, dozer or other) and have a crowned/shaped surface capable of shedding water to both sides. The crown of the trail should be 2-4%. The project will also require the installation of approximately 4 culverts by the contractor. The County will purchase and provide the culvert pipes for the project. Wisconsin DNR forest road BMPs for water quality must be followed throughout this project.
GC Bidding
$450,000.00
Public - County
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2026
October 5, 2026
Multiple Locations, Rib Lake, WI
Related To This Project
Rib Lake, WI
Bid Date: May 12 2026
Rib Lake, WI
Bid Date: May 12 2026
Rib Lake, WI
Bid Date: Apr 08 2026
Rib Lake, WI
Bid Date: Mar 30 2026
Rib Lake, WI
Bid Date: May 13 2025
Rib Lake, WI
Bid Date: Apr 09 2025
Rib Lake, WI
Bid Date: Apr 01 2025
Rib Lake, WI
Bid Date: Jan 30 2025
Rib Lake, WI
--
Rib Lake, WI
--
Rib Lake, WI
Bid Date: Jun 24 2024
Rib Lake, WI
Bid Date: Apr 10 2024
Rib Lake, WI
--
Rib Lake, WI
Bid Date: Jun 06 2022
Rib Lake, WI
Bid Date: Mar 10 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
