Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 16, 2025 at 8:00 PM
Updated April 17, 2025
Site work, paving and new construction of a mixed-use development in Yuba City, California. Completed plans call for site work for a road / highway; for paving for a road / highway; for the construction of a 2,700-square-foot pre-engineered storage facility; and pre-engineered storage facility.
The District is accepting proposals for design/build services to work closely with the College/District to plan and design a metal storage building to store college instructional materials associated with various programs including the Performing Arts theater and maintenance operations. This metal building shall be close to the building number 900 (Performing Arts and Culinary Services) theater shop with good access to the perimeter access roadway. All required drawings and specifications, engineering calculations and Architect/Engineer stamps, and coordination with DSA are included in the scope of work. Preliminary features of the metal storage facility include the following (not in priority): 1. Approximately 2,700 + square feet (larger if possible) Approximate minimum size: 45 feet x 60 feet. 2. The physical size of the metal storage building should be configured to allow an efficient internal racking layout with rows and access. 3. Clear Interior height: 18'-0" +/- 4. Perimeter interior protection against low level wall damage (low cost railing, etc.. ) 5. At least 5' wide x 8" thick gravel area around the building to keep weeds from growing right up next to the building. 6. Concrete slab floor 7. Asphalt paving entrance with at least a 20-foot-wide asphalt area at one end of the building. Large trucks will need access to unload at one end of the building. 8. Two (2) 3'-0" x 7'-0" Hollow Metal Doors, one at each end. 9. R-21 fiberglass batt in Walls, R-30 fiberglass batt at roof. 10. Natural Light through either roof panels or wall panels. 11. 12'-0" wide x 12'-0" steel roll-up door with electric motor opener. Bollards at roll-up door on both sides. 12. LED Lighting to provide industry acceptable interior and perimeter lighting levels. Bright lighting outside the 12' x 12' roll-up door 13. Building sealed at doors and walls to keep rodents and pests out of the building. 14. The building shall be weather-tight. Wind driven rains shall not enter the building. The doors shall all have seals. All roof penetrations shall be completely sealed, flashed and counterflashed per the pre-engineered and pre-fabricated roof manufacturer standard details. 15. Fire Alarm System (Edwards EST 4 System, tied into the campus fire alarm system) 16. Fire Suppression System 17. Intrusion Alarm System (roll up door and personnel access doors only) 18. Perimeter 6'-0" high chain link security fence with 12'-0" wide roll-open gate at roadway. 19. The College has several pallets of left over wall blocks from the construction of the Theater building. If it can be cost effectively used for accents, to tie-it into the theater building along one wall, or part of one wall, great. 20. Natural venting with screens to keep out pests to allow heat in the summer to leave the building. 21. Power outlets in strategic locations. 22. At least 80 amps extra spare breaker capacity in the electrical panel. 23. No restrooms or offices inside the building. 24. Interior racking will be purchased and installed later. All other interior upgrades will be constructed later. 25. The exact size, shape, and location of the building will be determined during the planning and design process with the College/District. The College preliminary layouts and planning work through tBP Architecture did address some of the code fire separation requirements that will need to be considered. The College would like this building to be secure and minimize through engineering design features that will help it to be protected from vandalism and theft. The College does on occasion have community visitors from either the Sherriff's detention center next door when clients are released, from the local homeless population, and from community demographics that can result in graffiti, broken windows, and small trash fires. 26. Include a topography survey and all due diligence to thoroughly inspect the site conditions at the Campus. Consider and plan for all traffic flows and required clearances to meet code requirements. 27. Quality Assurance: No damaged or discolored, or weathered, or dented, or warped components, parts, panels, warn or rubbed finished panels, dented doors, uneven or poorly finished concrete or asphalt paving, will be acceptable. All components to be new. The metal building shall meet all California code requirements. Any damaged components must be replaced at the cost of the Firm and the discretion of the District. 28. The preliminary list above does NOT include a domestic water source or evaporative cooling due to budget constraints and the purpose/use of this storage building. The District consists of two colleges, Woodland Community College and Yuba College, with campuses located at five different locations: Yuba College in Marysville, CA; Sutter County Center in Yuba City, CA; Woodland Community College in Woodland, CA; Colusa County Center in Williams, CA; and Lake County Campus in Clearlake, CA. The Yuba Community College District seeks Design/Build Proposals and Statements of Qualification from Licensed Architectural Design/General Contractor Firms to provide design/build services, DSA submission, and contract administration through construction. Woodland Community College Campus Address: 2300 East Gibson Road, Woodland, California 95776. Approximate Award Date: July 25, 2025 Question Deadline 04/07/2025 at 5:00 PM PT All questions and requests for information must be submitted to David Willis at: dwillis@yccd.edu. April 8th, 2025: 5:00 PM, Addendum Issued if needed. Construction Period Begins after Mobilization: May 4, 2026 Substantial Completion: June 12, 2027 Construction 100% Completed: July 10, 2027
Post-Bid
Warehouse / Distribution - Pre-Engineered Storage Building
$1,800,000.00
Public - State/Provincial
New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 15, 2025
December 11, 2025
Multiple Locations, Yuba City, CA
Related To This Project
Yuba City, CA
Bid Date: Apr 24 2025
Yuba City, CA
--
Yuba City, CA
Bid Date: Oct 21 2025
Yuba City, CA
Bid Date: May 01 2025
Yuba City, CA
Bid Date: May 07 2025
Yuba City, CA
Bid Date: May 21 2025
Yuba City, CA
Bid Date: May 12 2025
Yuba City, CA
--
Yuba City, CA
Bid Date: Mar 27 2025
Yuba City, CA
Bid Date: Mar 10 2025
Yuba City, CA
Bid Date: Feb 19 2025
Yuba City, CA
Bid Date: Feb 19 2025
Yuba City, CA
Bid Date: Feb 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
