BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 19, 2025 at 8:00 PM

Updated March 20, 2025

Site work, asbestos abatement and renovation of a mixed-use development in Arcola, Illinois. Completed plans call for the renovation of a educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.

Arcola C.U.S.D. 306 will receive Arcola C.U.S.D. 306 will receive bids for Asbestos Abatement for 2025 Flooring Replacement at Arcola Elementary & High School, 351 W. Washington Street in Arcola, IL. The work is to remove asbestos containing floor tile and associated mastic (approximately 4,000 square feet) and carpet and residual mastic (approximately 950 square feet) from four classrooms and an office area utilizing nonfriable removal methods. The Date of Commencement is June 23, 2025. The Date of Substantial Completion is July 1, 2025.

Bid Results

Educational

$31,700.00

Public - City

Asbestos Abatement, Renovation, Site Work

3

7

2

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
120
Bidding Soon
843
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2025

June 23, 2025

Project location map

351 W Washington St, Arcola, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.