Published March 20, 2025 at 8:00 PM

Updated March 21, 2025

Site work and paving for a civil project in Mount Calvary, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Question Deadline 03/13/2025 Questions regarding this project should be directed to Mr. Jeff Chvosta, P.E. of Gremmer & Associates, Inc. at (920) 924-5720 or j.chvosta@gremmerassociates.com. Questions received less than seven days prior to the date for opening of Bids may not be answered Description: The project generally consists of reconstructing the roadway to an urban section including storm sewer, and consists of the following approximate quantities: 1,775 CY Excavation Common 2,575 TON Base Aggregate Dense 700 TON HMA Pavement 2,190 LF Concrete Curb and Gutter 2,690 SY Restoration 1,360 LF Storm Sewer (12-Inch to 24-Inch) 4 EACH Adjust/Reconstruct Sanitary Sewer Manholes 6 EACH Adjust Water Valve Bids will be received on a unit price basis. Each bid must be accompanied by a bid bond as bid security, in the sum of five percent (5%) of the bid, payable to the Village of Mt. Calvary as a guarantee that if the bid is accepted, a Contract will be entered into and its performance properly secured within fifteen (15) days of the award of Contract. Should any bid be rejected, such bid security will be forthwith returned to the bidder, and should any bid be accepted, such bid bond will be returned upon the timely and proper execution and securing of the Contract. In case the successful bidder shall fail to execute the Contract and Performance Bond, the amount of the bid bond shall be forfeited to the Village of Mt. Calvary as liquidated damages. Contractor is required to submit the Bidder's Prequalification Statement to the Engineer a minimum of 3 business days prior to bid opening. Access to QuestCDN vBid will be provided upon review and approval of submitted prequalification statement. The Village of Mt. Calvary reserves the right to reject any or all bids, waive any informality in bidding, or accept the bid(s) which serves the best interest of the Village. Questions regarding this project should be directed to Mr. Jeff Chvosta, P.E. of Gremmer & Associates, Inc. at (920) 924-5720 or j.chvosta@gremmerassociates.com. For the Village of Mt. Calvary: Jerry Olig, Village President *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Roads / Highways

$800,000.00

Public - City

Paving, Site Work

65

12

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
4
Bidding Soon
964
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

April 28, 2025

Project location map

Multiple Locations, Mount Calvary, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.