BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 27, 2025 at 8:00 PM

Updated March 28, 2025

Site work for a road / highway in Calexico, California. Completed plans call for site work for a road / highway.

General work description: Replace existing controller cabinet, pedestrian signal, vehicle signal, camera detector, APS and cables of a traffic signal system. Install an intersection camera. The Department of Transportation (Department) Will Receive Quotes for Construction on State Highway in Imperial County in the City of Calexico on Route 98 at Kloke Road and Encinas Avenue and on Route 111 at Cole Road. District-County-Route-Post Mile: 11-Imp-98,111-31.30, 32.88, R2.21 Prime Contractor must have either a Class A license or an applicable Class C license. Prime Contractor must be a certified Small Business under Section 2-1.05. Department establishes no DVBE Contract goal but encourages bidders to obtain DVBE participation. Bids must be on a unit price basis. Complete the work within 180 working days. The estimated cost of the project is $ 270,800.00. No pre-bid meeting is scheduled for this project. Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests. Quotes results will not be listed on the Internet. Request quote results at: Analyst Name: Jomlonglak Kamaay Email: Jomlonglak.Kamaay@dot.ca.gov Phone: (279) 234-2503 Question Deadline 03/21/2025 Submit an RFI upon recognition of any event or question of fact arising under the Contract. The Engineer responds to the RFI within three (3) days. Submit bidders' inquiries to the District at: District: 11 Project Engineer Louie La Compte Telephone number: (858) 518-3850 Email Project Engineer: louie.lacompte@dot.ca.gov Proceed with the work unless otherwise ordered. You may protest the Engineer's response by: Submitting a potential claim record, using the Supplemental Potential Claim Record form, within three (3) days after receiving the Engineer's response. Complying with Section 5-1.43 Bid bonds are only required for agreements over $461,000.00. Contractors are no longer required to purchase and submit a Bid Bond when bidding on Minor B Projects. Section 2-1.34 of the 2024 Standard Specifications is not applicable to Minor B Projects. If the total bid exceeds $25,000, the successful bidder must furnish a payment bond to secure the claim payments of laborers, workers, mechanics, or materialmen providing goods, labor, or services under the Contract. This bond must be equal to at least 100 percent (100%) of the total bid (Pub. Cont. Code Section 7103). A performance bond is not required.

Post-Bid

Roads / Highways

$270,800.00

Public - State/Provincial

Site Work

8

9

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
4
Bidding Soon
241
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2025

April 23, 2025

Project location map

Multiple Locations, Calexico, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.