Published April 2, 2025 at 8:00 PM

Updated April 5, 2025

Site work and paving for a mixed-use development in Minneapolis, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Location: CSAH 5, 9, 36, 52, 152 in the City of Minneapolis. The major items of work are approximately: 1 LUMP SUM AS BUILT; 1 LUMP SUM MOBILIZATION; 2632 SQ FT PAVEMENT MARKING REMOVAL; 5 EACH REMOVE CASTING; 1 EACH REMOVE DRAINAGE STRUCTURE; 3 EACH REMOVE SIGN; 46 EACH SALVAGE SIGN; 30 LIN FT REMOVE SEWER PIPE (STORM); 14 LIN FT REMOVE CURB; 2742 LIN FT REMOVE CURB & GUTTER; 101 SQ YD REMOVE CONCRETE PAVEMENT; 272 SQ YD REMOVE BITUMINOUS PAVEMENT; 21400 SQ FT REMOVE CONCRETE WALK; 2 SQ YD SALVAGE LANDSCAPE ROCK; 10085 SQ FT REMOVE AND REPLACE BITUMINOUS PAVEMENT; 70 HOUR STREET SWEEPER (WITH PICKUP BROOM); 127 SQ YD CONCRETE PAVEMENT 8.0"; 61 LIN FT 12" RC PIPE SEWER DES 3006 CL V; 9 EACH ADJUST VALVE BOX; 7 EACH CASTING ASSEMBLY; 24 EACH ADJUST FRAME & RING CASTING; 8 LIN FT CONST DRAINAGE STRUCTURE DESIGN N; 2 EACH CONNECT INTO EXISTING DRAINAGE STRUCTURE; 1714 EACH DRILL AND GROUT REINF BAR (EPOXY COATED); 22993 SQ FT CONCRETE CURB RAMP WALK; 43 LIN FT CONCRETE SILL; 2937 LIN FT CONCRETE CURB & GUTTER; 65 LIN FT CONCRETE CURB DESIGN V; 1497 SQ FT TRUNCATED DOMES; 2 SQ YD INSTALL LANDSCAPE ROCK; 1 LUMP SUM TRAFFIC CONTROL SUPERVISOR; 1 LUMP SUM TRAFFIC CONTROL; 1 LUMP SUM ALTERNATE PEDESTRIAN ROUTE; 140 UNIT DAY PORTABLE CHANGEABLE MESSAGE SIGN; 18 EACH SIGN COLLAR; 46 EACH INSTALL SIGN; 2 EACH DELINEATOR / MARKER; 36.5 SQ FT SIGN; 19 EACH ADJUST HANDHOLE; 1 SYSTEM REVISE SIGNAL SYSTEM A; 1 SYSTEM REVISE SIGNAL SYSTEM B; 1 SYSTEM REVISE SIGNAL SYSTEM C; 1 SYSTEM REVISE SIGNAL SYSTEM D; 1 SYSTEM REVISE SIGNAL SYSTEM E; 1 LUMP SUM EROSION CONTROL SUPERVISOR; 53 EACH STORM DRAIN INLET PROTECTION; 280 LIN FT SEDIMENT CONTROL LOG TYPE COMPOST; 58 EACH SITE RESTORATION; 2982 SQ FT CROSSWALK PAINT; all in accordance with specifications and bid forms. SAP 027-030-077 2025 ADA Pedestrian Ramp Retrofits Phase 3 includes work on CSAH 5 (Franklin Ave) CSAH 9 (45th Ave) CSAH 36 (University Ave SE) CSAH 152 (Cedar Ave and Minnehaha Ave) Clarification Deadline 3/25/2025 2:00 PM The goals for this project are: SMBE Goal: 15% SWBE Goal: 19%

Bid Results

Roads / Highways

$1,127,060.00

Public - County

Paving, Site Work

85

16

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
146
Bidding Soon
1,560
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

May 1, 2025

Project location map

Multiple Locations, Minneapolis, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.