EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 27, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Manitowoc, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Replacement and abandonment of up to 312 private lead service lines (LSL) in an area generally described as north of Viebahn Street, south of Marshall Street, and between S 14th Street and S 26th Street. Work includes up to 224 full lead service line replacements from the watermain to the water meter, up to 21 replacements of the home portion only (from the curb stop to the water meter), up to 45 replacements of the street portion only (from the watermain to the curb stop), and up to 22 abandonments of unused lead service lines. Work may include, but is not limited to, the procurement of street, plumbing and electrical permits, coordinating and scheduling the installation with the property owner, installation of a new water service line utilizing trenchless technology, abandonment of the LSL, water meter installation, reconnection to the interior water distribution piping, residential cross connection inspection, electrical grounding modifications, and street restoration (if applicable). Pre-Qualification:Yes All Bidders shall be required to file or have on file with Manitowoc Public Utilities, a completed Bidder's Proof of Responsibility form, with receipt not less than five (5) days prior to the time of opening these Bids. Only Bidders who have demonstrated their qualifications to perform the work will be permitted to bid. Forms are included with the Bidding Documents. Manitowoc Public Utilities encourages Minority-and Women-Business Enterprises (MBE/WBE) and other Disadvantaged Business Enterprises (DBE) to submit bids for this project. The Utility's Lead Water Service Lateral Replacement Program makes use of Federal funds and therefore contractors, plumbers and electricians shall adhere to Use of the American Iron & Steel requirements for the water service, the meter setting rebuild and electrical grounding. Contractors shall comply with the Davis-Bacon Act for all lead service lateral replacements, including meter setting rebuilds and electrical grounding. Davis Bacon requires the use of prevailing wage rates as established by the U.S. Department of Labor. Also, all work shall comply with Use American Iron & Steel (AIS) and Build America Buy America (BABA) requirements. When subcontracting any portion of water service lateral work, all contractors must abide by the EPA's Disadvantaged Enterprise (DBE) regulations, which includes publishing bid ads containing the required DBE language. More information can be found at the WDNR or EPA websites.

Post-Bid

Roads / Highways

$700,000.00

Public - City

Paving, Site Work

3

5

2

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Backfill, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
34
Bidding Soon
592
All Active Projects
296
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2025

April 25, 2025

img_map_placeholder

Multiple Locations, Manitowoc, WI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

025 LSL Replacements, Project CT7

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.