Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 27, 2025 at 8:00 PM
Updated October 1, 2024
Site work and paving for a civil project in Manitowoc, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Replacement and abandonment of up to 312 private lead service lines (LSL) in an area generally described as north of Viebahn Street, south of Marshall Street, and between S 14th Street and S 26th Street. Work includes up to 224 full lead service line replacements from the watermain to the water meter, up to 21 replacements of the home portion only (from the curb stop to the water meter), up to 45 replacements of the street portion only (from the watermain to the curb stop), and up to 22 abandonments of unused lead service lines. Work may include, but is not limited to, the procurement of street, plumbing and electrical permits, coordinating and scheduling the installation with the property owner, installation of a new water service line utilizing trenchless technology, abandonment of the LSL, water meter installation, reconnection to the interior water distribution piping, residential cross connection inspection, electrical grounding modifications, and street restoration (if applicable). Pre-Qualification:Yes All Bidders shall be required to file or have on file with Manitowoc Public Utilities, a completed Bidder's Proof of Responsibility form, with receipt not less than five (5) days prior to the time of opening these Bids. Only Bidders who have demonstrated their qualifications to perform the work will be permitted to bid. Forms are included with the Bidding Documents. Manitowoc Public Utilities encourages Minority-and Women-Business Enterprises (MBE/WBE) and other Disadvantaged Business Enterprises (DBE) to submit bids for this project. The Utility's Lead Water Service Lateral Replacement Program makes use of Federal funds and therefore contractors, plumbers and electricians shall adhere to Use of the American Iron & Steel requirements for the water service, the meter setting rebuild and electrical grounding. Contractors shall comply with the Davis-Bacon Act for all lead service lateral replacements, including meter setting rebuilds and electrical grounding. Davis Bacon requires the use of prevailing wage rates as established by the U.S. Department of Labor. Also, all work shall comply with Use American Iron & Steel (AIS) and Build America Buy America (BABA) requirements. When subcontracting any portion of water service lateral work, all contractors must abide by the EPA's Disadvantaged Enterprise (DBE) regulations, which includes publishing bid ads containing the required DBE language. More information can be found at the WDNR or EPA websites.
Post-Bid
Roads / Highways
$700,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 05 - Metals
Division 07 - Thermal and Moisture Protection
Division 11 - Equipment
Division 12 - Furnishings
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 26, 2025
April 25, 2025

Multiple Locations, Manitowoc, WI
Related To This Project
Manitowoc, WI
Bid Date: Apr 09 2025
Manitowoc, WI
--
Manitowoc, WI
Bid Date: Mar 05 2025
Manitowoc, WI
Bid Date: Feb 26 2025
Manitowoc, WI
Bid Date: Mar 05 2025
Manitowoc, WI
Bid Date: Mar 05 2025
Manitowoc, WI
Bid Date: Mar 05 2025
Manitowoc, WI
Bid Date: Mar 03 2025
Manitowoc, WI
Bid Date: Feb 26 2025
Manitowoc, WI
Bid Date: Feb 26 2025
Manitowoc, WI
Bid Date: Mar 26 2025
Manitowoc, WI
Bid Date: Feb 27 2025
Manitowoc, WI
Bid Date: Feb 27 2025
Manitowoc, WI
Bid Date: Feb 26 2025
Manitowoc, WI
Bid Date: Mar 03 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.