Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 4, 2025 at 7:00 PM
Updated November 21, 2025
Remodeling and renovation of a stadium in Russellville, Arkansas. Completed plans call for the remodel of a stadium.
The Russellville School District Stadium Improvements - Pressbox, Concessions, Restroomsproject Includes the Constructionof a New Press Box, Restroom,and Concession Facilities. Bid Packages: 01 Demolition 02 Earthwork 03 Retaining Wall 04 Fencing 05 Concrete 06 Masonry 07 Structural and Misc. Steelmaterial Only 08 Structural and Misc. Steelinstallation Only 09 Carpentry 10 Architectural Wood Casework 11 Waterproofing, Water Repellents, and Joint Sealants 12 Hollow Metal Door, Frames, And Hardware Material Only 13 Hollow Metal Door, Frames, Hardware, and Specialties Installation Only 14 Aluminum Walls, Doors, and Glazing 15 Coiling Counter and Overhead Doors 16 Metal Studs, Gypsum Boardassemblies, and Acoustical Ceilings 17 Roofing, Sheet Metal, Andtrim 18 Resilient Flooring 19 Fluid-applied Flooring 20 Painting and Coatings 21 Specialties Material Only 22 Aluminum Canopy Awnings 23 Elevator 24 Fire Suppression System 25 Plumbing 26 Site Utility Piping 27 Hvac, Controls, and Integration 28 Electrical, Communications, Safety & Security Refer to the Instruction to Bidders Section of the Construction management Manual for Directions on Submitting Bids. Bids must Be Based on a Lump Sum amount and Must Be Inclusive Of all Construction Documents And bid Package Requirements. Include on Sealed Bid Proposal Envelope the Name of the Projectand the Bid Package Number. If submitting More Than One Bid package, Each Bid for Each Bid package Must Be in Separate sealed Envelopes. Fax and Email bids Are Also Accepted. Each Bid is Required to Include A Bid Bond in the Amount of 5% Of the Total Bid Offered, if the Bid Exceeds $50,000. The Bid Bond is To be in the Form of a Cashier's Check Or Insurance Surety Bond Using Document A310 With Power Of attorney Attached. Bond is to Be made Payable to Van Horn Construction, Inc. Trade Package Subcontracts more Than $50,000 Must Include The Cost of a Performance And payment Bond. Material Purchase Order Contracts of More Than$100,000 Must Include the Cost Of a Supply Bond. Successful Bidders Providing a Complete, Responsive, and Responsible Bid Will Be Required To furnish the Bond on Van Horn Construction's Bond Form Without Alteration, and to Execute A subcontract/purchase Order Contract With Van Horn Construction, inc. Samples Are Available for Review in the Construction Management Manual. The Owner and the Cm Reserve the Right to Reject Any-and-all bids, to Waive Any Formalities, and To Accept the Proposal Deemed to Be in Their Best Interest.
Post-Bid
Arenas / Stadiums
$1,000,000.00
Public - City
Remodeling, Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 20, 2025
December 22, 2025
To Be Determined, Russellville, AR
Related To This Project
Russellville, AR
Bid Date: Apr 14 2025
Russellville, AR
Bid Date: Apr 22 2025
Russellville, AR
Bid Date: Apr 21 2025
Russellville, AR
Bid Date: May 06 2025
Russellville, AR
Bid Date: May 30 2025
Russellville, AR
Bid Date: May 27 2025
Russellville, AR
Bid Date: May 20 2025
Russellville, AR
Bid Date: May 13 2025
Russellville, AR
Bid Date: Nov 20 2025
Russellville, AR
Bid Date: Mar 12 2025
Russellville, AR
Bid Date: Mar 13 2025
Russellville, AR
Bid Date: Mar 04 2025
Russellville, AR
--
Russellville, AR
Bid Date: Mar 11 2025
Russellville, AR
Bid Date: Mar 04 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
