BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 2, 2025 at 8:00 PM

Updated June 3, 2025

Site work and paving for a mixed-use development in Malone, New York. Working plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and water / sewer project.

The Village of Malone is seeking sealed bids for the construction of Veterans Memorial Park located at the intersection of Elm Street and Main Streets. All work on this contract is to be completed within 175 calendar days, starting ten (10) calendar days after the Notice of Award. Work is expected to be substantially completed within 150 days and fully completed on or before September 30, 2025. 5 percent of the Bid Amount on AIA A310 Bid Bond Form or Certified check. Refer to other bidding requirements described in Document 00 21 13 - Instructions to Bidders and Document 00 31 00 - Available Project Information. Prospective bidders are invited to submit their Bids, including Alternates, for work described as follows: Project Description: The Park will include a new cast-in-place reflecting pool with lighted fountain, brick paved plaza, concrete walks with benches, upgrades to municipal electric and water services. Stone veneer wall with park name and recycled native stone steps, monument cleaning, landscaping and lawn repairs. Bid proposals received after the date and time specified in the Invitation shall be considered unresponsive and will be rejected. The Village will not accept bids by FAX. The Village of Malone reserves the right to reject any and all bids or waive informalities in the Bidding. This offer shall be open to acceptance and is irrevocable for thirty days from the bid closing date. Technical questions should be directed to Michael Haas, RLA, at Delta 607-231-6631; mhaas@delta-eas.com and Tim Insinger, RLA 607.231.6628. tinsinger@delta-eas.com. Tender has been cancelled. The project will be re-tendered, date is undetermined at this time, will be for Autumn 2025 construction start.

Final Planning

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
492
Active Projects
254
Bidding Soon
3,200
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

July 25, 2025

Project location map

Main St & Elm St, Malone, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.