BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2025 at 8:00 PM

Updated September 25, 2025

Demolition, site work and paving for a mixed-use development in Rio Linda, California. Completed plans call for the demolition of a military facility; for site work for a military facility; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The purpose of this project is to demolish the Sacramento Resident Office and supporting site structures including site restoration for turnover to owning agency. The project site consists of three (3) modular trailers, one (1) gazebo, two (2) storage structures, and two (2) parking areas. The work shall include demolition of three (4) designated structures, removal of reinforced concrete curbs and sidewalks, cutting and removal of asphalt pavement, and disconnection and capping of utilities. The total square footage of the buildings to be demolished is estimated to be 6,000 SF with a total of square footage of supporting structures to be removed at 700 SF and 24,000 SF of parking lot. **A pre-contract site visit will be on Thursday, 10 April 2025 @1000am at 2194 Ascot Avenue, Rio Linda, California..** **A pre-contract site visit will be held on 3 April 2025 at 10:00am PT at 2194 Ascot Avenue, Rio Linda, California.* Questions due to Henry Barron at henry.d.barron@usace.army.mil by 6 April 2025, no later than 11:00 am PT. The purpose of this project is to demolish the Sacramento Resident Office and supporting site structures including site restoration for turnover to owning agency. The project site consists of three (3) modular trailers, one (1) gazebo, two (2) storage structures, and two (2) parking areas. The work shall include demolition of three (4) designated structures, removal of reinforced concrete curbs and sidewalks, cutting and removal of asphalt pavement, and disconnection and capping of utilities. The total square footage of the buildings to be demolished is estimated to be 6,000 SF with a total of square footage of supporting structures to be removed at 700 SF and 24,000 SF of parking lot. Period of Performance (POP) is one hundred and twenty (120) calendar days from the date of award.

Award

Military

$57,300.00

Public - Federal

Demolition, Paving, Site Work

15

9

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
421
Active Projects
166
Bidding Soon
2,411
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2025

May 29, 2025

Project location map

2194 Ascot Ave, Rio Linda, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.