BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 14, 2025 at 8:00 PM

Updated May 15, 2025

Site work, paving and renovation of a mixed-use development in Los Angeles, California. Completed plans call for the renovation of a educational facility; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project upgrades the following facilities to comply with the Americans with Disabilities Act (ADA) and improve program accessibility: 19 accessible paths of travel, 10 restrooms, 6 drinking fountains/sinks, 1 assistive listening device/intercom/phone, 1 concrete ramp, 11 metal ramps, 3 assembly seats, 12 railings, 1 cafeteria counter, 1 new stage lift with stage adapt, and other miscellaneous upgrades. PROJECT LOCATION 11530 Strathern Street, North Hollywood, CA 91605 Question Deadline 04/10/2025 Address all questions and correspondence to the RFQ Contact Person shown on Important Dates page, and copy armin.farzaneh@lausd.net on all SOQ question correspondence. ssue FINAL Addenda by: Monday, 04/14/2025 In accordance with the provisions of Public Contract Code section 3300, OWNER has determined that the CONTRACTOR performing this project must hold the following license as the prime contractor: B - General Building Contractor. A prime CONTRACTOR self-performing any of the following specialty trades must also hold the required specialty license: Includes but not limited to C7 - Low Voltage, C10 - Electrical, C11 - Elevator, C22 - Asbestos Abatement, C36 - Plumbing. Anticipated Start Date of Notice to Proceed: May 2025 Substantial Completion (370 calendar days after NTP date): May 2026 Final Completion (400 calendar days after NTP date):June 2026 Questions concerning the SOQs in this RFQ must be submitted in writing or email by the Last Day for Statement of Qualifications Questions date as indicated in the Important Dates section of the RFQ. Questions may be submitted using the Pre-Proposal/Bid Clarification Form provided in the attachments. Address all questions and correspondence to the RFQ Contact Person shown on Important Dates page, and copy armin.farzaneh@lausd.net on all SOQ question correspondence. The District has adopted SBE and VBE participation programs. The District has established goals of 25% participation by certified SBEs, including micro- businesses, and 5% participation by VBEs, in the total contract amount. SBE, Micro-SBE, or VBE certified subcontractors,service providers, and materialsuppliers at all tiers may be counted in achieving these goals, but amounts passed through such certified SBEs and VBEs to non-SBE or non-VBE contractors, service providers, or materials suppliers shall not be counted in achieving participation goals 220385, 1730-0729 909-987-0909, J814, 2510159

Bid Results

Sidewalks / Parking Lot

$2,389,000.00

Public - County

Paving, Renovation, Site Work

87

22

9

4

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
602
Active Projects
269
Bidding Soon
3,388
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2025

May 2, 2025

Project location map

11530 Strathern St, Los Angeles, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.