Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 14, 2025 at 8:00 PM
Updated May 15, 2025
Site work for a mixed-use development in Los Angeles, California. Completed plans call for site work for a playground / park / athletic field.
PROJECT LOCATION Clover Elementary School, located at 11020 Clover Ave., Los Angeles, CA 90034 This is an emergency project that resulted from the Soil testing that was performed as part of the Preliminary Environmental Assessment Equivalent (PEA-E) requested by OEHS for the main project Classroom Replacement at Clover ES. The scope of work required for the Grass Field Replacement includes the remediation of arsenic-impacted soil in unpaved playgrounds, landscape areas, tree wells, and other designated Areas of Concern (AOCs). Excavation will occur to depths of 1 to 3 feet below surface, with approximately 6,854 excavated cubic yards of impacted soil to be removed--294 cubic yards classified as hazardous waste and 6,560 cubic yards as non-hazardous. Following soil removal, clean soil will be imported, and the site will be regraded, with new irrigation systems and vegetation planted in remediated areas. All activities will adhere to LAUSD Environmental Specifications, ensuring safety, compliance, and environmental protection. The remaining scope for the Classroom Replacement Project will be performed through a second contract. LICENSES: B - GENERAL CONTRACTING C-12 - EARTHWORK AND PAVING C-22 - ASBESTOS ABATEMENT C-27 - LANDSCAPING AND GRADING Anticipated Start Date of Notice to Proceed: May 2025 Substantial Completion (196 calendar days after NTP date): December 2025 Final Completion (226 calendar days after NTP date): January 2026 Issue FINAL Addenda by: 04/17/2025. Question Deadline 04/14/2025 Address all questions and correspondence to the RFQ Contact Person shown on Important Dates page, and copy myint.moe@lausd.net and z.carrascocastan@lausd.net on all SOQ question correspondence. The District has adopted SBE and VBE participation programs. The District has established goals of 25% participation by certified SBEs, including microbusinesses, and 5% participation by VBEs, in the total contract amount. CONTRACT BOND ESTIMATE The District’s Contract Bond Estimate is $2,984,000.00
Award
Playgrounds / Parks / Athletic Fields
$5,598,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 22, 2025
May 22, 2025
11020 Clover Ave, Los Angeles, CA
Related To This Project
Los Angeles, CA
Bid Date: Apr 23 2025
Los Angeles, CA
Bid Date: Mar 21 2025
Los Angeles, CA
Bid Date: Mar 25 2025
Los Angeles, CA
Bid Date: Apr 01 2025
Los Angeles, CA
Bid Date: Mar 25 2025
Los Angeles, CA
Bid Date: Apr 24 2025
Los Angeles, CA
Bid Date: Mar 18 2025
Los Angeles, CA
Bid Date: Mar 26 2025
Los Angeles, CA
Bid Date: Apr 04 2025
Los Angeles, CA
Bid Date: Mar 14 2025
Los Angeles, CA
Bid Date: Apr 08 2025
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Apr 15 2025
Los Angeles, CA
Bid Date: May 12 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
