BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 14, 2025 at 8:00 PM

Updated May 15, 2025

Site work for a mixed-use development in Los Angeles, California. Completed plans call for site work for a playground / park / athletic field.

PROJECT LOCATION Clover Elementary School, located at 11020 Clover Ave., Los Angeles, CA 90034 This is an emergency project that resulted from the Soil testing that was performed as part of the Preliminary Environmental Assessment Equivalent (PEA-E) requested by OEHS for the main project Classroom Replacement at Clover ES. The scope of work required for the Grass Field Replacement includes the remediation of arsenic-impacted soil in unpaved playgrounds, landscape areas, tree wells, and other designated Areas of Concern (AOCs). Excavation will occur to depths of 1 to 3 feet below surface, with approximately 6,854 excavated cubic yards of impacted soil to be removed--294 cubic yards classified as hazardous waste and 6,560 cubic yards as non-hazardous. Following soil removal, clean soil will be imported, and the site will be regraded, with new irrigation systems and vegetation planted in remediated areas. All activities will adhere to LAUSD Environmental Specifications, ensuring safety, compliance, and environmental protection. The remaining scope for the Classroom Replacement Project will be performed through a second contract. LICENSES: B - GENERAL CONTRACTING C-12 - EARTHWORK AND PAVING C-22 - ASBESTOS ABATEMENT C-27 - LANDSCAPING AND GRADING Anticipated Start Date of Notice to Proceed: May 2025 Substantial Completion (196 calendar days after NTP date): December 2025 Final Completion (226 calendar days after NTP date): January 2026 Issue FINAL Addenda by: 04/17/2025. Question Deadline 04/14/2025 Address all questions and correspondence to the RFQ Contact Person shown on Important Dates page, and copy myint.moe@lausd.net and z.carrascocastan@lausd.net on all SOQ question correspondence. The District has adopted SBE and VBE participation programs. The District has established goals of 25% participation by certified SBEs, including microbusinesses, and 5% participation by VBEs, in the total contract amount. CONTRACT BOND ESTIMATE The District’s Contract Bond Estimate is $2,984,000.00

Award

Playgrounds / Parks / Athletic Fields

$5,598,000.00

Public - County

Site Work

48

26

24

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
555
Active Projects
160
Bidding Soon
3,695
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2025

May 22, 2025

Project location map

11020 Clover Ave, Los Angeles, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.