BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 17, 2025 at 8:00 PM

Updated April 18, 2025

Site work and paving for a road / highway in Durango, Colorado. Completed plans call for site work for a road / highway.

Reference Number 0000378464 Bid Intent Not Available The City of Durango invites interested, qualified persons or firms, capable of providing the required service to submit bids to construct a mineral aggregate and asphalt binder surface treatment installed as a High-Density Mineral Bond over the roadway surface at 10 locations in the City of Durango. Question Deadline 03/31/2025 at 3:00 PM MT Questions are submitted online Yes Buyer Preferences, Guidelines & Requirements Participation Requirements - Business Concern - Disadvantaged Business Enterprise (DBE) - Minority Business Participation - Native American Participation - Small Business Participation - Service-Disabled Veteran Owned - Women-Owned Business Participation General Requirements - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % The City of Durango reserves the right to reject any and all bids, to waive any informalities and minor irregularities in bids, and to accept the bid deemed, in the opinion of the City, to be in the best interest of the City of Durango. Generally, the work under this contract includes furnishing all labor, materials, and equipment necessary for applying a HA-5 Sealcoat to approximately 73,302 square yards of asphalt street surface, at Ten (10) locations in the City of Durango. (See the (10) locations on the Bid Schedule, attached). The successful contractor shall be responsible for placing a HA-5 Seal coat on the City Streets listed in the bid schedule. The successful contractor shall supply public relations, accommodate resident needs, other materials, equipment, operators and supply street sweeping for the work areas. The successful contractor shall supply all traffic control necessary to complete the job during operations as required in the Manual of Traffic Control Devices (MUTCD) Part-6 and shall file an appropriate traffic control plan with the City Engineer at least 14 days prior to start of work. All work shall be completed under the supervision and inspection of the Project Manager or assigned agent. Any deviation from the standard specifications shall be approved, in writing, in advance. Any deviation from the standard specifications without prior authorization shall result in the immediate suspension of work, and possible termination of contract.

Award

Roads / Highways

$285,937.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
16
Bidding Soon
160
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

June 2, 2025

Project location map

Multiple Locations, Durango, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.