Published March 19, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a transportation facility in Columbus, Ohio. Completed plans call for the renovation of a transportation facility.

The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following 1. Project provides PLC and equalization pump upgrades at the John Glenn Columbus International Airport Glycol Pump Station motor control center accessories, wiring and control panel components and cabling and other Work indicated in the Contract Documents. B. Type of Contract: 1. Project will be constructed under a single prime contract. Questions Deadline: March 21, 2025 2:00pm GLYCOL PLC SYSTEM UPGRADE AND PROJECT - John Glenn International Airport CRAA will reject any bids or unsolicited bid addenda that are received after the deadline Bidders shall make a good faith effort to obtain DBP participation of 17.16% of the dollar value of the Contract. Acceptable surety documents in an amount equal to 10% of the Bid Price including Alternates: An irrevocable Letter of Credit, or Certified Check, or Cashier's Check Acceptable surety document in an amount equal to 100% of the Bid Price, including Alternates: A Bid and Performance Bond executed by the bidder and a surety company authorized to do business in the State of Ohio and satisfactory to CRAA, in substantial compliance with 49 CFR Part 18.36(h)(2) and ORC 153.571 and a Payment Bond in accordance with 49 CFR Part 18.36(h)(3).

Post-Bid

Transportation Terminals

$297,239.00

Public - City

Renovation

58

13

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Starting and Adjusting, Closeout Procedures, Closeout Submittals, Maintenance Data, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Toilet, Bath, and Laundry Accessories
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Facility Electrical Power Generating and Storing Equipment, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
69
Bidding Soon
1,315
All Active Projects
523
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2025

July 1, 2025

img_map_placeholder

4600 International Gateway, Columbus, OH

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Glycol PLC System Upgrade

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.