Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 15, 2025 at 8:00 PM
Updated May 16, 2025
Demolition, site work and addition to a water / sewer project in Westwood, Massachusetts. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.
Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The Contractor will be required to fully complete the project within 540 consecutive days of the start date fixed The scope of work includes installation of poly- and per-fluoroalkyl substances (PFAS) treatment filter vessels and construction of approximately 2,800 sq. ft. building addition at the White Lodge Water Treatment Plant located at 154 University Ave., Westwood, MA. The new building addition is brick masonry building. The work includes: new PFAS vessels, relocating chemical feed equipment, replacement of motor control equipment, replacement of greensand filter piping, instrumentation, and SCADA, electrical, HVAC, and associated civil/site work including design and installation of support of excavation systems. Furnishing and installing 12-ft. diameter pressure vessel PFAS treatment system to treat up to 4.5-MGD of water. Estimated construction cost: $12,100,000
Bid Results
Water / Sewer
$14,916,000.00
Public - City
Addition, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2025
July 8, 2025
154 University Ave, Westwood, MA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
