Published May 15, 2025 at 8:00 PM

Updated May 16, 2025

Demolition, site work and addition to a water / sewer project in Westwood, Massachusetts. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The Contractor will be required to fully complete the project within 540 consecutive days of the start date fixed The scope of work includes installation of poly- and per-fluoroalkyl substances (PFAS) treatment filter vessels and construction of approximately 2,800 sq. ft. building addition at the White Lodge Water Treatment Plant located at 154 University Ave., Westwood, MA. The new building addition is brick masonry building. The work includes: new PFAS vessels, relocating chemical feed equipment, replacement of motor control equipment, replacement of greensand filter piping, instrumentation, and SCADA, electrical, HVAC, and associated civil/site work including design and installation of support of excavation systems. Furnishing and installing 12-ft. diameter pressure vessel PFAS treatment system to treat up to 4.5-MGD of water. Estimated construction cost: $12,100,000

Bid Results

Water / Sewer

$14,916,000.00

Public - City

Addition, Demolition, Site Work

97

41

29

3

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
577
Active Projects
271
Bidding Soon
3,916
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

July 8, 2025

Project location map

154 University Ave, Westwood, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.