Published March 31, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a pipeline in Holyoke, Massachusetts. Completed plans call for site work for a pipeline.

The bulk of work to be performed will including installation of 4"- 8" IPS HDPE and 12"-16" coated steel low-pressure (LP) natural gas mains and 1.25"-4" LP plastic services as part of the PHMSA FY22 NGDISM Grant funded project in the City of Holyoke, Massachusetts, hereinafter referred to as "Municipality". Most services will be HDPE plastic direct buried or directional bored to an outside riser but insertion may be used when possible. Affected meter sets that are already outside will be reconnected to the new main or a new outside riser by the Contractor. Affected meter sets that are inside will be piped through the wall by HG&E personnel or another third-party contractor. In no case shall re-piping or reconnection be performed more than ten (10) feet downstream of the outlet of the existing meter(s) by the Contractor. The work includes removal of existing pavement, concrete, unsuitable soil, and installation and backfilling of the trenches in accordance with applicable state and local restoration standards including all required permit conditions. The Contractor will perform live main connection and abandonment. Billings for such operations will consist of a combination of unit price charges where definable and time and material charges for the balance. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Gas Construction Contractor to perform natural gas distribution pipeline upgrades including but not limited to main and service installations and abandonment, as well as any required street, sidewalk and lawn restoration as part of a HG&E's federally funded PHMSA FY22 NGDISM Grant project. These construction services are anticipated to begin in Q2 2025 and be completed by Q4 2026. All bidders are required to submit a bid deposit equal to $150,000. The successful bidder will be required to obtain satisfactory Payment and Performance Bonds each equal to $3,000,000. Question Deadline 03/27/2025

Post-Bid

Pipeline

$150,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
447
Active Projects
282
Bidding Soon
3,354
All Active Projects
1,494
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

April 30, 2025

img_map_placeholder

To Be Determined, Holyoke, MA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Gas Construction Contractor FY22 NGDISM

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.