Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published May 1, 2025 at 8:00 PM
Updated May 2, 2025
Site work and paving for a road / highway in Friendship, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.
All bids must be submitted in a sealed envelope to the Town of Adams Highway Crew Director, Dick Buhalog, at the Town Hall. The envelope should clearly display the project number on the front and be addressed to The Town of Adams Chair. Wedging 9th Ave. starting at new pavement north of Deerborn north to C.R. “J”. . Scope of Work: The work under this contract shall consist of wedging and paving 2 inches of hot mix asphalt at a width of at least 3+/- feet on both sides of 9th Ave , and placing 2 foot shoulders with ¾ inch CABC rolled and compacted. 2. Hot Mix Asphaltic Pavement: The hot mix shall be Wisconsin DOT approved 4 LT 5828S Mix design. Mix will be placed with a paver and rolled for compaction. Mix will be placed at a compacted thickness of 2 inches and width of at least 3+/- feet on each side of the road. Each driveway shall have a minimum 18” asphalt apron. 3. Preparation: Prior to the application of the bituminous mix, the existing pavement shall be cleaned of all dust, other loose material, silt spots, vegetation and other deleterious materials utilizing a power broom. Any deleterious material not removed by mechanical sweeping shall be removed by hand. Particular care shall be taken to thoroughly clean the outer edges of the area to be wedged. The contractor shall be responsible for removal of all deleterious material. After cleaning and prior to wedging, a tack coat of a 50% diluted asphalt emulsion type CSS-1, CSS-1h, SS-1 or SS-1h shall be applied to the surface at a nominal rate of 0.025 gallons per square yard. Bid received from Gasser – $63,549.74 Bid received from Scott – $33,333.30
Bid Results
Roads / Highways
$71,146.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 14, 2025
April 17, 2025
Multiple Locations, Friendship, WI
Related To This Project
Friendship, WI
Bid Date: Mar 14 2025
Friendship, WI
Bid Date: May 20 2025
Friendship, WI
Bid Date: May 22 2025
Friendship, WI
Bid Date: Jun 12 2025
Friendship, WI
--
Friendship, WI
Bid Date: Sep 09 2025
Friendship, WI
Bid Date: May 14 2021
Friendship, WI
Bid Date: Nov 03 2025
Friendship, WI
Bid Date: Mar 14 2025
Friendship, WI
Bid Date: Mar 14 2025
Friendship, WI
Bid Date: Mar 14 2025
Friendship, WI
--
Friendship, WI
Bid Date: Mar 14 2025
Friendship, WI
Bid Date: Mar 12 2025
Friendship, WI
Bid Date: Nov 18 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed