BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 17, 2026 at 8:00 PM

Updated September 23, 2026

Site work and paving for a mixed-use development in Friendship, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

Limit - STH 13 To 3rd Lane Perpetuation project to resurface approximately 12.17 centerline miles of STH 21 between STH 13 and 3rd Lane in the Towns of Coloma, Preston, and Richfield in Adams and Waushara Counties. Design an anticipated 3.5 inch mill and overlay on the mainline and shoulders. Additional work includes guardrail evaluation, spot curb and gutter repair, and approximately 22 cross culvert replacements. An ICE Phase 2 with traffic counts will be required to determine the best safety alternatives at the intersection of STH 21 and CTH V in the town of Richfield/Coloma Anticipated Construction Cost: $11,000,000-$11,999,999 The Method of Contractor Selection Has Not Been Determined at This Time. WI DOT - RFP Engineering - Necedah - Coloma (STH-021) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Roads / Highways

$11,999,999.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
62
Bidding Soon
1,170
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

WI-21, Friendship, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.