BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2025 at 8:00 PM

Updated May 3, 2025

Site work for a water / sewer project in Valdosta, Georgia. Completed plans call for site work for a water / sewer project.

Knights Creek Trunkline Rehabilitation Phase 2 for installation of +/- 2,450 LF of 24" gravity sewer including related work. The work consists of clearing and grubbing of the easement area as well as supplemental work areas required by the contractor, commissioning of a preconstruction as-built survey of the existing infrastructure to serve as a performance benchmark for new construction, establishment and maintenance of an appropriately sized bypassing arrangement to maintain sustained operation of the sewer system (without overflows) during the work period, demolition of the existing gravity sewer system as necessary, installation of +/- 2,450 LF of 24" gravity sewer piping, installation of six (6) new 60" DIA precast concrete sewer manholes, maintenance of erosion control measures during construction, final stabilization of all disturbed areas with permanent grassing, and commissioning of a final as-built survey of the newly constructed infrastructure. The new sewer system may be 24" SDR26 PVC gravity sewer installed by way of open cut, 24" DR17 HDPE gravity sewer installed by way of pipe bursting, or some combination of the two methodologies. If a blended construction methodology is intended to be utilized, the existing manhole spacing must be maintained and pipe materials must be consistent from manhole to manhole The contract time is 150 calendar days. For more information contact Charlie Clark, Engineering Project Manager, at (229) 259-3530. No bid may be withdrawn for a period of thirty (30) days after the scheduled time for receiving the bids. Bids must be accompanied by a certified check or bid bond in an amount of not less than five (5) percent of the amount bid. A Contract Performance Bond and Payment Bond equal to one hundred (100) percent of the contract price will be required. If bid price is $25,000.00 or less no bonds are required. The City of Valdosta reserves the right to reject any or all bids, to waive informalities and to readvertise. The City of Valdosta is an equal opportunity employer.

Post-Bid

Water / Sewer

$700,000.00

Public - City

Site Work

8

5

7

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
53
Bidding Soon
572
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

May 12, 2025

Project location map

Multiple Locations, Valdosta, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.