BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 27, 2025 at 8:00 PM

Updated March 28, 2025

Site work and paving for a civil project in Okanogan, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

3rd Avenue Reconstruction and Utility Replacement This project consists of the reconstruction of approximately 1,700 LF of 3rd Avenue from Irene Street to Greta Street, including, but not limited to, excavation, grading, crushed surfacing materials, hot mix asphalt, storm drainage facilities, cement concrete curb and gutter, sidewalk, replacement of water main and sewer main along 3rd Avenue and adjacent areas, pavement markings, surface restoration, utility adjustments, and other work all in accordance with the attached Contract Plans, Special Provisions, and the Standard Specifications ENGINEER'S ESTIMATE $2,300,000 - $2,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Proposals will be publicly opened and read aloud shortly after the time and date stated above. Proposals are to be submitted only on the form provided with the Bid Documents. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the "City of Okanogan" and in an amount of not less than five percent (5%) of the total Proposal amount. Subject to any extensions of the Contract Time granted under the Contract, the undersigned agrees to substantially complete the Work required under this Contract within 130 working days (the Substantial Completion Date) and to physically complete the Work required under this contract within 140 working days (the Physical Completion Date) from when Contract Time begins. The undersigned has reviewed and fully understands the provisions in the Contract regarding liquidated damages and agrees that liquidated damages shall be $1,500.00 per day for each and every working day beyond the Contract Time allowed for substantial completion until the Substantial Completion Date is achieved and $750.00 for each and every working day required beyond the Contract Time for physical completion until the Physical Completion Date is achieved.

Bid Results

Roads / Highways

$1,817,301.00

Public - City

Paving, Site Work

42

5

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
8
Bidding Soon
172
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.