Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2025 at 8:00 PM

Updated May 15, 2025

Site work and paving for a civil project in Vail, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Work generally includes excavation, directional boring, electrical conduit installation, and asphalt patching. Work is scheduled to be performed between May 12, 2025 and November 15, 2025. Question Deadline 04/07/2025 at 2:00 PM MT Contractor shall provide the Town with a Warranty Bond in the amount of thirty-three percent (33%) of the Contract Price, and this bond shall remain in effect for the full extent of the warranty period.

Award

Roads / Highways

$2,394,994.00

Public - City

Paving, Site Work

49

10

7

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
81
Bidding Soon
1,015
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2025

May 12, 2025

Project location map

Multiple Locations, Vail, CO


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed