BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 16, 2025 at 8:00 PM

Updated April 17, 2025

Site work and paving for a mixed-use development in Forestville, California. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

** As of April 16,2025 , this project has not yet been awarded. A timeline for award has not yet been established.** The Work consists of construction of County's Steelhead Beach ADA Improvements, at 9000 River Road, Forestville, California, 95436. The work consists of the demolition of existing asphalt concrete and concrete paths and pads, construction of new asphalt concrete and concrete paths and pads, new truncated domes, seal coat and restriping accessible parking stalls and signs, accessible picnic sites and amenities, remove and replace existing drinking fountains, and related amenities. The deadline for any questions or clarifications prior to submittal of bids is Friday, April 4, 2025 @ 12:00 PM. All other inquiries regarding the Project should also be directed to Project Manager: Mark.Cleveland@sonoma-county.org Bid open description: The public bid opening will be conducted via a Teams meeting. To participate use the following access details: https://teams.microsoft.com/l/meetup-join/19%3ameeting_NDcyNzQxOTUtMzcxZi00ZjAzLWJkZTYtMzc0YjU4MTM0MzBh%40thread.v2/0context=%7b%22Tid%22%3a%22ecfd017d-15bb-494b-9072-cb313101730c%22%2c%22Oid%22%3a%22593ad1c0-8b29-4670-b954-02337507d5bf%22%7d Meeting ID: 263 683 210 789 Dial in by phone +1 707-582-0058,,867783152# United States, Santa Rosa Find a local number Phone conference ID: 867 783 152# TO REQUEST ACCOMMODATION FOR THIS MEETING contact the meeting host. Instructions for turning on closed captioning located here: https://support.microsoft.com/en-us/office/use-live-captions-in-a-teams-meeting-4be2d304-f675-4b57-8347-cbd000a21260 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The estimated base bid construction cost is $175,000 to $210,000.

Bid Results

Sidewalks / Parking Lot

$120,000.00

Public - County

Paving, Site Work

7

19

24

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
302
Active Projects
138
Bidding Soon
1,895
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

May 12, 2025

Project location map

9000 River Rd, Forestville, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.