Published June 10, 2025 at 8:00 PM

Updated June 11, 2025

Demolition and renovation of a mixed-use development in Crosby, Minnesota. Completed plans call for the renovation of a educational facility; and for the demolition of a educational facility.

As of April 10, 2025, the construction manager will be presenting the bid results to the school board soon. Project is currently on schedule. The work will be accomplished through multiple contracts with Crosby-Ironton School District 182, with Contegrity Group Inc. acting as the Construction Manager. The following categories of work will be bid (subject to change): Demolition/ General Construction/Masonry, Gypsum Board, Acoustical Treatments, Painting, Casework & Countertops, Mechanical/ Plumbing /HVAC, and Electrical. Project Scope: Interior remodeling of Gymnasium, Classrooms, Athletic areas, Auditorium, Restrooms and related Support Spaces in an existing Sprinklered Secondary School Building. Existing facility is two-story, 213, 637 SF divided into 5 Fire Areas by existing fire walls. Project is scattered throughout areas of building. This project has a Prevailing Wage Requirement. BID SECURITY: Each bid shall be accompanied by a certified check, cashier's check, or corporate surety bond in an amount equal to five (5%) percent of the base bid, as bid security. If awarded a contract, each successful Bidder shall be required to furnish both Performance and Payment Bonds covering faithful performance of the contract and the payment of all obligations arising under such contract. Such bonds shall be the latest edition of the AIA Document A312/CM, in the amount equal to 100% payment. If the contract is less than $75,000 an irrevocable Letter of Credit from a financial institution will be acceptable under the same terms and conditions of Performance & Payment Bonds. Crosby-Ironton School District 182 reserves the right to reject any or all bids received and to waive any informalities and irregularities in the bidding. Bids may not be withdrawn or modified within forty-five (45) days after the closing time and date Construction is anticipated to commence late April 2025 and complete prior to the start of the new school year in September 2025. Bid Results :: CATEGORY 1 - DEMOLITION/GENERAL CONSTRUCTION/MASONRY :: Rice Lake Construction Group :: $1,276,400.00 CATEGORY 4 - GYPSUM BOARD :: R&H Drywall, Inc. :: $91,400.00 CATEGORY 12 - PAINTING :: Fransen Decorating, Inc :: $62,500.00 CATEGORY 16 - MECHANICAL/PLUMBING/HVAC :: Thelen Heating & Roofing, Inc. :: $369,600.00 CATEGORY 18 - ELECTRICAL :: Holden Electric Co., Inc. :: $538,000.00

Bid Results

Educational

$2,337,900.00

Public - City

Demolition, Renovation

145

24

11

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
15
Bidding Soon
369
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

June 2, 2025

Project location map

711 Poplar St, Crosby, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.