BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 12, 2026 at 7:00 PM

Updated February 13, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Crosby, Minnesota. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Major Items Are 127 Cu Yds of Structural Concrete, 73,300 Pounds of Reinforcement Bars (Epoxy Coated), 3,809 Sq Ft of Bridge Concrete Slab, 1 Lump Sum of Remove Existing Bridge, and 1,000 Lin Ft of C-i-p Concrete Piling 20". Direct questions about this Project, including pre-bid questions, to Daria Graupman at 218-822-2680 and daria.graupman@crowwing.gov. LENGTH: 0.114 Miles

Award

Bridges / Tunnels

$1,692,850.00

Public - City

Demolition, New Construction, Paving, Site Work

131

13

6

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2026

March 1, 2026

Project location map

Co Rd 31, Crosby, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.