Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 8, 2025 at 8:00 PM
Updated May 9, 2025
Renovation of a mixed-use development in Chimney Rock, Colorado. Completed plans call for the renovation of a military facility.
COLUMBINE OFFICE PAINTING PROJECT: SAN JUAN NATIONAL FOREST, COLORADO ********See the SOW, Attachment 1, for details on the SITE VISIT scheduled or April 8, 2025.********** The work in this contract consists of the general construction of providing all the materials, labor, and equipment necessary to conduct surface repair, preparation, priming, and painting/staining of all previously painted or stained exterior surfaces at the Columbine District Ranger Site. In addition, all stair treads are to be replaced at the Bayfield Modular Office Building. Lastly, the columns holding the gabled overhand above the front deck of the Columbine District Ranger Office are to be replaced. The buildings to be painted are Columbine Ranger District Office, Bayfield Office #2, Bayfield Office #3, Bayfield Warehouse/Garage, Bayfield Modular Office, Bayfield Fire Cache/Tack Storage. The contractor will also be required to remove, store, and reinstall any exterior items that may impede required work. These items may include but is not limited to exterior lighting, mirrors, signs, air conditioning units, water hoses, and electrical boxes. An on-site interior storage area shall be designated by the COR prior to equipment removal. All plants are to be protected using an appropriate cloth and any required trimming shall be conducted by the contractor after receiving COR approval. All other landscaping shall be protected by a painter's drop cloth. The work in this contract consists of the general construction of providing all the materials, labor, and equipment necessary to conduct surface repair, preparation, priming, and painting/staining of all previously painted or stained exterior surfaces at the Columbine District Ranger Site. In addition, all stair treads are to be replaced at the Bayfield Modular Office Building. Lastly, the columns holding the gabled overhand above the front deck of the Columbine District Ranger Office are to be replaced. The buildings to be painted are Columbine Ranger District Office, Bayfield Office #2, Bayfield Office #3, Bayfield Warehouse/Garage, Bayfield Modular Office, Bayfield Fire Cache/Tack Storage. The contractor will also be required to remove, store, and reinstall any exterior items that may impede required work. These items may include but is not limited to exterior lighting, mirrors, signs, air conditioning units, water hoses, and electrical boxes. An on-site interior storage area shall be designated by the COR prior to equipment removal. All plants are to be protected using an appropriate cloth and any required trimming shall be conducted by the contractor after receiving COR approval. All other landscaping shall be protected by a painter's drop cloth. PROJECT: COLUMBINE OFFIC PAINTING PROJECT SAN JUAN NF in LAPLATA COUNTY, COLORADO POC: JANICE KING, janice.king@usda.gov and LUCAS DAHLMAN, lucas.dahlman@usda.gov NAICS: 238320 PAINTING and WALL COVERING SIZE STANDARD: $19M DISCLOSURE OF MAGNITUDE: $25,000 $100,000 The work for this project includes replacing stair treads at the modular building, replacing deck overhang columns at the ranger office and painting or staining of all exterior surfaces of the Columbine District Ranger Office compound. Contractor will provide all the materials, labor, and equipment necessary to conduct surface repair, preparation, priming, and painting/staining of all previously painted or stained exterior surfaces. The buildings to be painted are Columbine Ranger District Office, Bayfield Office #2, Bayfield Office #3, Bayfield Warehouse/Garage, Bayfield Modular Office, Bayfield Fire Cache/Tack Storage. See the SOW and SOI for more details of the scope of work for this project. Continued The Contractor shall begin performance within 10 calendar days and complete it within 65 calendar days after A Site Visit is scheduled for April 8, 2025, at 1:00 p.m. MST at 367 South Pearl Street in Bayfield, Colorado, 81122. To schedule a site visit, contact the COR, Ryan Tolle, at (970)508-0345 or via email at Ryan.Tolle@usda.gov no later than April 4, 2025, at 3:00 p.m. MST. Questions are due by April 14, 2025, at 10:00 a.m. Central Time. Proposals are due by May 6, 2025, at 10:00 a.m. Central Time. Questions and Proposals shall be submitted via email to the following: POC: JANICE KING, janice.king@usda.gov and LUCAS DAHLMAN, lucas.dahlman@usda.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Military
$100,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
11
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2025
June 16, 2025
Multiple Locations, Chimney Rock, CO
Related To This Project
Chimney Rock, CO
Bid Date: Jul 31 2025
Chimney Rock, CO
Bid Date: Sep 27 2023
Chimney Rock, CO
Bid Date: Dec 21 2020
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
