BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2025 at 8:00 PM

Updated May 29, 2025

Demolition and site work for a warehouse / distribution facility in San Francisco, California. Completed plans call for the demolition of a warehouse / distribution facility; and for site work for a warehouse / distribution facility.

**As of May 27th , this project has not yet been awarded. The project is expected to be awarded on June 10th, 2025** The Port of San Francisco (the "Port") announces an Invitation for Bids ("IFB") for construction on in San Francisco, CA. The work will consist of a base scope of work to demolish the landside buildings and structures at the Pier 90 site (except the grain silo structures), abandon underground utilities in place and perform hazardous materials abatement as needed. Additive bid alternates include: (1) Steel loading tower demolition, (2) Wharf deck and piles demolition, and (3) Fence work. Bidders are further advised that they may not discriminate in the selection of subcontractors on the basis of race, gender, or any other basis prohibited by law, and that they shall undertake all required good faith steps in such a manner as to ensure that neither MBEs nor WBEs nor OBEs are unfairly or arbitrarily excluded from the required good faith efforts. In addition, the Port of San Francisco seeks to promote diversity within its contracting opportunities. Thus, the Port of San Francisco strongly encourages bids from Bidders that optimize the use of S.F. Small and Micro-LBE certified subcontracting firms. The Port of San Francisco also seeks to further optimize the use of contractor teams that reflect the diversity of the City and County of San Francisco. As such, the City recommends that Bidders consider the composition of their teams in terms of gender, age, ethnicity, and race, and to utilize teams that include a diverse mix of staff at all organizational levels. For more information, contact the Project Manager, Erica Petersen at 415-819-1889. 2.00% MBE; 1.00% WBE; 2.00% OBE; Contract Monitoring Division Local Business Enterprise (LBE) Subcontracting Requirement: LBE = 5.00%

Bid Results

Warehouse / Distribution

$865,000.00

Public - City

Demolition, Site Work

268

26

9

8

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
489
Active Projects
207
Bidding Soon
2,942
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

June 16, 2025

Project location map

To Be Determined, San Francisco, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.