BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2025 at 8:00 PM

Updated April 2, 2025

Renovation of an educational facility in Goshen, Utah. Completed plans call for the renovation of a educational facility.

Addition of a new air-cooled chiller to the school's HVAC system, set within a newly constructed chiller compound made of chain link fence with slates. The contractor will m740odify the existing boiler room to accommodate a new two-pipe cooling and heating system. Additionally, the contractor is to install fan coils provided by the owner while retrofitting them with new coils to suit the new cooling/heating system, the contractor will also be required to run new cooling/heating piping throughout the building. The project also requires modifications to existing air handlers and associated ductwork to fit new cooling/heating coils, adding VFDs to the air handlers, and upgrading the relief air fan system. Budget: $1,500,000.00 Start Date: June 1, 2025 Completion Date: August 1, 2025 Liquidated Damages: $500 per day Questions Due: March 24, 2025 by 1:00 pm Questions Due All questions shall be submitted at least seven days in advance of bidding This project is TAX EXEMPT Trades: demolition, cast-in-place concrete, plumbing, HVAC, testing & balancing, electrical, chain link fences & gates, site furnishings. The project consists of: 1. Demolition of the existing pumps, and piping indicated on drawings. 2. Installation of new heating/chilled water piping as indicated on drawings 3. Installation of the owner provided air cooled chiller. 4. Installation on new building pumps and Vfds, boiler pumps, and chiller pump. 5. Installation of new expansion tank and new air separator. 6. Draining, reclaiming and storing existing glycol from the area of system being demoed and reworked as needed. 7. Bring existing glycol % up to 30% and bring existing inhibitors up to 2-3% of the system volume. 8. Balancing new pumps and equipment. 9. Upgrading existing DDC controls and existing BMS system 10. Installation of owner provided fan coils. 11. Installation of coils into owner provided fan coils 12. Installation of duct mounted coils as indicated on drawings.

Post-Bid

Educational

$1,500,000.00

Public - County

Renovation

31

13

8

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
54
Bidding Soon
813
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

June 2, 2025

Project location map

60 N Center St, Goshen, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.