BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 1, 2025 at 8:00 PM

Updated July 2, 2025

Demolition, site work, renovation and addition to a mixed-use development in Bradford, Pennsylvania. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Questions Due Date: Apr 4th 2025, 11:00 AM EDT Contact Information: Lois Hall, LHall@wcupa.edu Pursuant to 62 P.S. 532 "Prequalification of bidders and offerors", West Chester University is issuing this Request for Qualification (RFQ) to pre-qualify contractors to bid on South Campus Apartment Addition and Major Renovation project. This RFQ applies only to the above subject project, and pursuant to the low bid process (competitive sealed bidding) for construction projects, only those companies that are pre-qualified will be invited to bid. West Chester University of Pennsylvania (University), a University of the State System of Higher Education, an Instrumentality of the Commonwealth of Pennsylvania, requires performance of construction work and is inviting contractors to pre-qualify for construction capabilities in the following categories: Contract No. 1: General Construction Contract No. 2: Heating, Ventilating and Air Conditioning (HVAC) Construction Contract No. 3: Plumbing Construction Contract No. 4: Electrical Construction The Project entails the demolition of attic spaces in (11) buildings along with all mechanical, plumbing, and electrical equipment, the construction of an additional floor above the existing apartments thus adding (4) new apartments per building for a total of (44) apartments, and the major renovation of the (102) existing apartments. The project will have 4 phases spanning over 6 years. Phase 1 includes (2) buildings containing (10) apartments each. Phase 2 includes (3) buildings containing (10) apartments each. Phase 3 includes (4) buildings containing (8) apartments each. Phase 4 includes (2) buildings containing (10) apartments each.

Award

Educational

$386,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

90 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
108
Bidding Soon
1,278
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2025

May 21, 2025

Project location map

Campus Dr, Bradford, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.