Published April 9, 2025 at 8:00 PM

Updated April 10, 2025

Site work for a civil project in Nora Springs, Iowa. Completed plans call for site work for a water / sewer project.

The extent of the work involved is the construction of Stream Bank Stabilization & Protection along the North shoreline of the Shell Rock River at the Old Mill Pond Park in Nora Springs, IA including, but not limited to the following: Excavation Class 10 Unsuitable or Unstable Materials, Excavation Class 10 Waste, Macadam Stone Base, Corrugated Metal Entrance Pipe, Engineering Fabric, Revetment Class E, Flagstone Steps, Weir Stones, and miscellaneous associated work, including cleanup. The Proposal shall be made out on the form furnished by the City of Nora Springs and obtained from WHKS & Co., Engineers, Planners, and Surveyors, and must be accompanied in a sealed envelope by either: (1) a certified check, or a cashier's check drawn on an Iowa bank, or a bank chartered under the laws of the United States, in an amount of 5% of bid amount; or (2) a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount of 5% of bid amount; or (3) a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa, in the penal sum of 5% of bid amount. The Contractor shall commence work on or before the Late Start Date: July 28th , 2025, and shall be completed on or before August 31 st , 2025. The Contractor may begin work on the project before the Late Start Date; however, once the Contractor begins work on the project, work shall progress in a continuous manner and shall be completed within 35 calendar days or less. Working days will begin to be charged whenever the Contractor begins work on the project. Charging of working days will begin on the Late Start Date if the Contractor has not started work prior to the Late Start Date. The successful bidder will be required to furnish a bond in an amount equal to one hundred (100) percent of the contract price, said bond to be issued by a responsible surety approved by the Owner and which shall guarantee a faithful performance of the Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all materials and labor and protect and save harmless the Owner from claims and damages of any kind caused by the operations of the Contractor and shall also guarantee the maintenance of the improvements constructed for a period of two (2) year(s) after completion and acceptance by the Owner.

Bid Results

Water / Sewer

$214,590.00

Public - City

Site Work

49

6

7

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
66
Bidding Soon
693
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2025

July 28, 2025

Project location map

Multiple Locations, Nora Springs, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.