Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 20, 2025 at 8:00 PM

Updated May 22, 2025

Renovation of an educational facility in Windham, Connecticut. Completed plans call for the renovation of a educational facility.

Ref. #: ECSU 2025-507 The work involves the installation of waterproofing at the basement corridor of Mead Hall. Summary of Work includes but is not limited to the following: 1. Partial removal and disposal of the existing corridor ceiling. 2. Preparation and installation of foaming polyurethane injection grout and crack sealer at foundation wall cracks. 3. Installation of new ceiling and refinishing concrete foundation wall. Question Deadline 04/04/2025 at 2:00 PM ET Questions through Online Portal The SBE requirement is 25% of the entire bid total with 6.25% to an MBE/WBE

Award

Educational

$75,028.00

Public - State/Provincial

Renovation

4

12

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,039
Active Projects
498
Bidding Soon
6,684
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2025

May 19, 2025

Project location map

83 Windham St, Windham, CT


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed