Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 2, 2025 at 8:00 PM
Updated October 3, 2025
Site work and renovation of a civil project in Toronto, Ontario. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Question Deadline 03/31/2025 Deadline for Questions Five (5) business days before closing deadline. This contract includes Work at three (3) Sewage Pumping Stations (SPS) including forcemain works in the City of Toronto, namely, Fallingbrook SPS, Greyabbey SPS, and Humber SPS. There are following Works, in general, to be performed at these SPS: Fallingbrook SPS forcemain: - Approximately 105m of 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from the sewage pumping station to the existing Maintenance Hole at Fallingbrook Crescent, and - Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Greyabbey SPS forcemain: - Approximately 310m of twin 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from 150m south of Fordover drive to 100m west of Fintona avenue. - Replacement of the existing discharge Maintenance Hole, and - Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Humber SPS forcemain: - Approximately 223m of twin 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from the sewage pumping station to the existing Maintenance Hole at Brule Terrace, and - Replacement of the existing discharge Maintenance Hole. Additionally, this contract also includes in general: A pre-construction survey of all properties and CCTV inspection of existing sewers and maintenance holes prior to commencement of the Work, installation of new and/or removal of existing chambers, temporary bypassing of the SPS during the Work, testing and commissioning of the installed forcemains, and Permanent Restoration. Documents are available at https://discovery.ariba.com/rfx/22527102 * The project value listed reflects the package estimate. ** The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.
Award
Water / Sewer
$4,731,006.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 22, 2025
May 22, 2025
Multiple Locations, Toronto, ON
Related To This Project
Toronto, ON
Bid Date: Mar 27 2025
Toronto, ON
Bid Date: Mar 27 2025
Toronto, ON
Bid Date: Apr 30 2025
Toronto, ON
Bid Date: Mar 26 2025
Toronto, ON
Bid Date: Mar 21 2025
Toronto, ON
Bid Date: Mar 26 2025
Toronto, ON
Bid Date: Apr 08 2025
Toronto, ON
Bid Date: May 28 2025
Toronto, ON
Bid Date: Apr 10 2025
Toronto, ON
Bid Date: Apr 16 2025
Toronto, ON
Bid Date: Apr 02 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
