BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 14, 2025 at 8:00 PM

Updated August 15, 2025

Site work and outdoor lighting for a civil project in Cleveland, Ohio. Working plans call for site work for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; water / sewer project; and water / sewer project.

As of August 14, 2025, this project is soon to be permitting. An architect and a construction manager has been selected. A firm timeline for construction has not been determined however, construction is expected to begin January 2026 and be completed second quarter of 2027. *The closed solicitation has been included below for reference: 1. In accordance with O.R.C. Section 9.33, the Cleveland-Cuyahoga County Port Authority (the "Port" or "Owner") is soliciting Statements of Qualifications ("Qualifications") for construction management at-risk services from qualified construction managers ("CM") for the Ore Conveyance Tunnel Modernization Project at the Cleveland Bulk Terminal located at 5400 Whiskey Island Drive, Cleveland, Ohio, 44102 (the "Project"). 2. The Project includes the rehabilitation, updates and maintenance on the ore conveyance tunnel infrastructure at the Whiskey Island facility, including steel framing and hoppers, tunnel interior steel coating (as needed), air handling equipment replacements/upgrades, dust suppression system, and improved interior lighting for maintenance and safety. The work requires taking the existing ship loader offline. Accordingly, most work will need to occur during the annual shipping shut down period from the middle of January to end-of-February. (Note: Certain components of the work for the Project, including procurement and installation of jet fans and electrical lighting, has already been performed by a separate contractor during the 2025 shutdown period.) Additional information about the Project is included in Exhibit A. 3. Owner's construction budget for the CM's work and services on the Project is $5,200,000, which includes all cost of the work (including subcontracted work and any approved self-performed work), preconstruction fee, . 1. CM services for the Project will include, but not be limited to, design review and preconstruction services, cost estimating, scheduling, prequalification of subcontractors to perform the required work, construction, and close-out phases of the Project. CM services will be 4917-6731-1655.2 2 defined in an agreement with the Owner (the "CM Agreement"). construction and at-risk fees, general requirements, general conditions and staffing, and construction contingency. 4. The design professional for the Project is RE Warner & Associates, Inc. ("Design Professional")

Pre-Construction/Negotiated

Bridges / Tunnels

$5,200,000.00

Public - County

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
262
Active Projects
135
Bidding Soon
2,198
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

January 5, 2026

Project location map

5400 Whiskey Island Dr, Cleveland, OH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.