Site work and paving for a mixed-use development in Norwalk, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of May 13, 2025 This project has been awarded to Stephen Doreck Equipment Rentals, Inc., with the awarded amount of $3,194,303.65** Liquidated Damages $1000/day Estimated Bid Value $4,000,000 - $5,000,000 Project Duration 270 Working Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 03/31/2025 11:00 AM (PDT) The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the City Engineer. The grant funding for the AMI/AMR meters requires that, at a minimum, 477 meters (services as needed) and meter boxes shall be installed, all funds are expended by City and Contractor, and invoices are processed before June 30, 2025. The meter installations must be completed in compliance with the terms and conditions set forth by the United States Bureau of Reclamation (USBR) as outlined in Appendix C. Other components of the project may be completed in accordance with the submitted construction schedule. The Contractor will be responsible for data collection per City templates. Data collected is to include: property addresses, meter types, meter sizes, meter serial numbers, meter readings, endpoint serial number, installation date and time, before and after photos, PDF format plans showing replaced water service pipeline information with reference stations and other dimensions to existing water main. Following the completion of the water related work, the project involves application of Cape Seal, Slurry Seal to the streets, grinding of existing pavement, removal and replacement of asphalt at localized repairs, removal and replacement of curb and gutter. The project also includes restoration of traffic striping, legends and crosswalks. Incidental work involves replacement of traffic related items such as striping and pavement markings. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$3,194,304.00

Public - City

Paving, Site Work

58

17

6

7

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
585
Active Projects
139
Bidding Soon
3,823
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2025

June 13, 2025

Project location map

Multiple Locations, Norwalk, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.