BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 15, 2025 at 8:00 PM

Updated April 16, 2025

Demolition, site work and addition to an educational facility in Delta, Missouri. Completed plans call for the addition of a 2,500-square-foot educational facility; for the demolition of a educational facility; and for site work for a educational facility.

The purpose of this RFQ is to prequalify contractors capable of constructing a kitchen addition, including the integration and installation of existing and potential new kitchen equipment, with related site improvements. Construction of a 50x50-foot kitchen addition attached to existing FEMA building. - Preferred metal construction, open to justified alternative solutions. - Installation of existing and potential new kitchen equipment. Award Notification: By April 9, 2025 Construction Start: June 2025 (target) . Delta R-5 School District reserves the right to reject any or all submissions or to waive any informalities in the bidding process.

Post-Bid

Educational

$1,000,000.00

Public - City

Addition, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
63
Bidding Soon
581
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2025

June 2, 2025

Project location map

To Be Determined, Delta, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.