BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 4, 2025 at 8:00 PM

Updated April 10, 2025

Renovation of an educational facility in Winnipeg, Manitoba. Completed plans call for the renovation of a educational facility.

1 The purpose of the Commissioning process is to provide the Owner of the facility with the assurance that the building systems have been installed according to the Contract Documents and will operate within the performance guidelines set out in the Design Intent and the Specifications. The commissioning process includes specific tasks to be conducted during each phase in order to verify that design, construction, and training meets the Owner's Project requirements. 2 All Contractors and related Subcontractors shall be responsible for cooperating and coordinating their Work with the commissioning team. The Contractors shall be responsible for carrying out all the activities required for the initial installation of components and systems, and for operating the systems as required during the commissioning process. 3 The Commissioning process does not reduce the responsibility of the installing Contractors to provide a fully functional finished Product in accordance with the Contract Documents. A Performance Bond of a Company Registered to Conduct the Business of a Surety in Manitoba, in the Form Attached to the Tender Documents, in the Amount of Fifty Percent (50%); of the Contract Price; and A Labour and Materials Payment Bond of a Company Registered to Conduct the Business of Surety in Manitoba, in the Form Attached to the Tender Documents, in the Amount of Fifty Percent (50%) of the Contract Price. Question Acceptance Deadline: 2025/04/04 04:00:00 PM CDT Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Educational

$300,000.00

Public - State/Provincial

Renovation

15

15

2

2

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
51
Bidding Soon
527
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2025

May 12, 2025

Project location map

1100 Chancellor Dr, Winnipeg, MB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.