BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 19, 2025 at 8:00 PM

Updated June 20, 2025

Renovation of an educational facility in Winnipeg, Manitoba. Completed plans call for the renovation of a educational facility.

Reference Number 0000289727 Pricing Lump sum 1 Responsibility for packaged equipment system controls installation, testing and commissioning as supplied by other sections of Division 23 including responsibility for any miscellaneous field control wiring and sensor/device mounting to achieve the required packaged controls sequence of operation, including, 1 Mounting and control wiring related to EF-1, 2 Mounting and control wiring related to SF-1, 3 Mounting and control wiring related to HC-1, 2 Co-ordinate and provide for any dedicated 120V power circuits required for operation of controls provided under this specification. Wiring methods to Division 26 standards. .3 Responsibility for all control wiring, mounting and operational commissioning of loose supplied controls provided by others as part of a packaged equipment supply. 4 Provision O&M manuals, as-built control shop drawings and Owner training of systems use and one-year warranty services. .5 Refer to Division 26 Electrical drawings for control wiring methods to Division 26 standards; co-ordinate and pay for all control and power wiring required under this section. .6 Provide O&M training as noted in Section 21 05 01. Bids shall be accompanied by a bid bond in the amount of 10% of the bid price. Bidders must conform to Winnipeg School Division Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Educational

$207,000.00

Public - State/Provincial

Renovation

20

14

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
18
Bidding Soon
547
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

June 2, 2025

Project location map

405 Parr St, Winnipeg, MB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.