Published April 3, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Kingfisher, Oklahoma. Completed plans call for site work for a water / sewer project.

12,490 L.F. 6" PVC CL 200 Complete in Place, 5 - 6" Gate Valves, 2 - Connections to Existing Water Lines, 500 L.F. Directional Bore for Creek Crossings, 90 L.F. Road Bores and Casing 14 - connections to existing meters, 500 L.F. PE DR 11 for Creek Crossing, 1 Fire Hydrant and Valve and all appurtenances. Small Business and Minority Business Sources Are Encouraged to Bid on This Project. Important - Security Companies Executing Bonds Must Appear on the Treasury Departments Most Current List and Be Authorized to Transact Business in the State Where the Project is Located. The OWNER may waive any informalities or minor defects or reject any and all BIDS. Any BID may be withdrawn prior to the above scheduled time for the opening of BIDS or authorized postponement thereof. Bids received more than ninety-six (96) hours before time specified and Bids received after the time set for opening Bids will not be considered and will be returned unopened. No BIDDER may withdraw a BID within 60 days afterthe actual date ofthe opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the OWNER and the BIDDER. BIDDERS must satisfy themselves ofthe accuracy ofthe estimated quantities in the BID schedule by examination of the site and a review of the drawings and specifications including ADDENDA. After BIDS have been submitted, the BIDDER shall not assert that there was a misunderstanding concerning the quantities of WORK or of the nature ofthe WORK to be done. The OWNER shall provide to BIDDERS prior to BIDDING, all information which is pertinent to, and delineates and describes, the land owned and rights-of-way acquired or to be acquired. The CONTRACT DOCUMENTS contain the provisions required for the construction of the PRODUCT. Information obtained from an officer, agent, or employee ofthe OWNER or any other person shall not affect the risks or obligations assumed by the CONTRACTOR or relieve the contractor from fulfilling any ofthe conditions of the contract. Each bid must be accompanied by a bid bond payable to the OWNER for five percent of the total amount of the bid. A certified check may be used in lieu ofthe bid bond. No bid security is required ifbid is $7,500.00 or less. As soon as the bid prices have been compared, the OWNER will return the bonds of all except the three lowest responsible bidders. The bid bond ofthe successful bidder will be retained until the Performance Bond, Statutory Bond, Maintenance Bond, and Certificate of Insurance have been executed and approved, after which it will be returned. The bid security ofthe two remaining unsuccessful Bidders will be returned after the successful bidder has entered into a contract and has furnished the required bonds and insurance. A Performance Bond, Statutory Bond and Maintenance Bond each in the amount of 100 percent ofthe Contract Price with a corporate surety approved by the OWNER will be required for the faithful performance ofthe Contract. Attomeys-in-fact who sign Bid Bonds and Performance Bonds must file with each Bond a certified and effective dated Copy oftheir Power-of-Attomey.The OWNER shall award a contract to the lowest responsible bidder or bidders within sixty (60) calendar days after bid opening. The OWNER may extend the award period not to exceed fifteen (15) calendar days by formal recorded action and for good cause.The party to whom the contract is awarded will be required to execute the Agreement and obtain the Performance Bond, StatutoryBond, Maintenance Bond andCertificate ofInsurance within ten (10) calendar days from the date when Notice ofAward is delivered to the Bidder. The Notice ofAward shall be accompanied by the necessary Agreement and Bond forms. In the of failure ofthe Bidderto execute the Agreement, the OWNER may consider the Bidder in default in which case the Bid Bond accompanying the proposal shall become the property ofthe OWNER.The OWNER within ten (10) calendar days ofreceipt of acceptable Agreement, Bonds and Certificate of Insurance signed by the party to whom the Agreement was awarded shall sign the Agreement and return to such party an executed duplicate of the Agreement. Should the OWNER not execute the Agreement within such period, the BIDDER may by WRITTEN NOTICE withdraw the signed Agreement. Such NOTICE of withdrawal shall be effective upon receipt of the NOTICE by the OWNER. BIDDER hereby agrees to commence WORK under this contract within ten (10) calendar days of the date to be specified in the NOTICE TO PROCEED and to fully complete the PROJECT within 60 consecutive calendar days thereafter. BIDDER further agrees to pay as liquidated damages, the sum of $ 500.00 for each consecutive calendar day thereafter as provided in Standard.

GC Bidding

Water / Sewer

$200,000.00

Public - County

Site Work

10

5

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Project Record Documents
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
40
Bidding Soon
466
All Active Projects
207
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2025

May 26, 2025

img_map_placeholder

Multiple Locations, Kingfisher, OK

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Water Line Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.