EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 22, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Bradford, Pennsylvania. Completed plans call for site work for a water / sewer project.

The work essentially involves the installation of a fixed base advanced metering infrastructure (AMI) system and appurtenances including, but not limited to, a data collection system, telecommunication equipment and the installation of water meters and meter interface units. Meters, Meter Interface Units (MIUs) and Data Collection Units (DCUs) will be furnished by the Authority to the Contractor. Installation of the facilities installed as part of this Contract shall be conducted on Authority and privately owned properties. The Authority currently has approximately 5,788 metered connections within its service territory. Water service to the Authority's customers is metered through meters ranging in size from 5/8" x 3/4" diameter residential meters to 6" diameter cold water meters. Project Cost Estimate: $1,100,000. Project Location: The work is located throughout the entire water service area of the Authority. The Authority serives four municipalities situated within McKean County. Proposed Start Date: June 4, 2025. Estimated Completion Date: December 31, 2026.

Bid Results

Water / Sewer

$952,883.00

Public - City

Site Work

3

8

6

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Execution, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
53
Bidding Soon
755
All Active Projects
318
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2025

June 4, 2025

img_map_placeholder

Multiple Locations, Bradford, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Installation of Fixed Base Advanced Metering Infrastructure

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.