Site work and paving for a mixed-use development in Seattle, Washington. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The project includes the following work: The UW ADA Parking Improvement Project is an ongoing initiative to provide accessible parking (compliant with the Americans with Disabilities Act requirements) at key locations on campus in response to a Consent Decree imposed on the University of Washington. Phase 3.2 includes improvements at the parking lot E03 and garage lots N27, N28, W20, W21, W22, and W23. The scope at E03 includes, but is not limited to, selective site demolition, pavement removal, regrading, asphalt and concrete paving, striping, and signage installation. The scope at the garage lot N27 includes grinding of existing asphalt, regrading, and asphalt overlay at a limited area above an existing below-grade sensitive space, along with striping and signage installation. The scope at N28 includes removal of pavement striping, restriping, and signage installation. The scope at the garage lots W20-23 includes removal of pavement striping/signage, restriping, and signage installation in an existing garage structure. All work will be verified by a third-party testing agency under contract with UW, and an additional testing agency under contract with Plaintiff. All work will be verified by a third-party testing agency under contract with UW. Substantial completion will be met when work is verified for compliance by Owner's independent testing agency, and all permit conditions including final inspections are complete. Questions: Questions about this project should be directed to: Joss Gramstad, Consultant, KPFF Consulting Engineers, Phone: 206.622.5822 (O) / 206.926.0642 (D) Joss.Gramstad@kpff.com A surety company bid bond on a form acceptable to Owner, a cashier's check or a certified check payable to the order of University of Washington, or cash, shall accompany each bid in an amount not less than five percent (5%) of the Base Bid. No bidder may withdraw its bid after the hour set for the opening thereof, unless the award of the contract is delayed for a period exceeding 60 days. The Owner reserves the right to reject any or all bids and to waive as an informality any irregularities in the bids received. 15% minority and women-owned business utilization Question Deadline 03/31/2025
Bid Results
Parking Garage
$310,279.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 10, 2025
June 16, 2025
To Be Determined, Seattle, WA
Related To This Project
Seattle, WA
Bid Date: Apr 16 2025
Seattle, WA
--
Seattle, WA
Bid Date: May 01 2025
Seattle, WA
Bid Date: Apr 16 2025
Seattle, WA
Bid Date: Apr 22 2025
Seattle, WA
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.