Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 23, 2025 at 8:00 PM

Updated April 24, 2025

Site work for a bridge / tunnel in Grand Forks, North Dakota. Completed plans call for site work for a bridge / tunnel.

2025 Bridge Rehabilitation Est. Completion Date: Aug. 15, 2025 Rehabilitation of various sites including bridges and box culverts. 779 SY - Penetrating Water Repellent Treatment, 115 LF - Epoxy Crack Injection, 6 SF - Barrier Repair, 75 LF - W-Beam Guardrail Removal and Replacement, 4 EA Reset W-Beam Guardrail End Terminal, 1 EA - Temporary Stream Diversion, 1 L SUM - Debris Removal, 1 L SUM - Bridge Repair, 1 LSUM - Deck Drainage System, 46 SF - Deck Spall Repair, 222 SF - Spall Repair, and Other Items

Award

Bridges / Tunnels

$364,595.00

Public - City

Site Work

26

4

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
11
Bidding Soon
200
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

May 15, 2025

Project location map

To Be Determined, Grand Forks, ND


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed