Published March 28, 2025 at 8:00 PM
Updated October 1, 2024
Site work for a civil project in Lafayette, Indiana. Completed plans call for site work for a water / sewer project.
Construction of a new wastewater treatment plant, lagoon system, including furnishing and installing all excavation, appurtenances, electrical, restoration, clean-up and all other work for a complete installation. The work generally. consists of improvements that include the following: Influent 4" Force Main Influent Flow Meter Influent structure with manual bar screens and slide gates Two (2) new treatment lagoons with baffles, approx. 928,000 gals ea. One (1) new storage lagoon, approx. 3,127,000 gals Interconnection piping and structures Floating Aerators with Diffused Air as a Mandatory Alternate Effluent Pump Station Structures (no pumps or controls). Effluent Flow Meter Effluent B" Force Main Air Release Valve Vaults Approximately 400ft of Horizontal Directional Drilling Non-Potable Water Well New garage Electrical Equipment All other work for a complete and operable installation as shown on the plans and in written in the specifications. Contract B- Wastewater Collection System, Buck Creek Gravity Sewer 10,200 LF of B gravity Sewer 1,290 LF of 3" force Main One Jack and bore railroad crossing 31 sanitary sewer manholes Two air release valves Two wastewater pump stations One Duplex Grinder station One ejector station All other work for a complete and operable installation. as shown on the plans and in written in the specifications Contract C- Wastewater Collection System, Force Main between Buck Creek and Colburn 5,000 lineal feet of force main mandatory Directional Drill 18,000 lineal feet of 3 force main- open cur or directional drill 15 Air release Valve Structures One jack and bore railroad crossing All other work for a complete and operable installation as shown on the plans and in written in the specifications Contract D-Wastewater Collection System, Colburn Gravity Sewer 8,000 LF of B" gravity Sewer 5,965 LF of 4" force Main One jack and bore railroad crossing 33 sanitary sewer manholes Two air release valves Two wastewater pump stations Four ejector stations All other work for a complete and operable installation as shown on the plans and in written in the specifications. Each proposal shall be accompanied by a bid guaranty conforming to the Indiana Revised code. The bid guaranty shall be a certified check in an amount equal to five percent (5%) of the BID; or, a bond for five percent (5%) of the BID as surety for the execution of the contract. The bid band or certified check should be made out to the Tippecanoe County Board of Commissioners. The bid bond form is included in the bidding documents. Should any BID be rejected, such certified check or bond shall be forthwith returned to the BIDDER, and should any BID be accepted, such certified check or bond will be returned upon the proper execution and securing of the Agreement. When the Agreement is executed, the certified check or bid bond of all unsuccessful BIDDERS will be returned. Proposals shall be properly and completely executed on proposal forms included in the Specifications. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Agreement and to complete the work contemplated therein. The contractor to whom the work is awarded will be required to furnish, before commencing. work, a performance and payment bond in an amount equal to the bid price of the contract awarded to said contractor, and certificates of all insurance required in the specifications. All bonds and liability insurance shall remain in effect for a period of twelve (12) months following completion and acceptance of construction. The award of the contract is subject to all approvals required by local agencies. Upon securing of all approvals, the successful bidder shall receive a "Notice to Proceed" with construction and said contractor shall begin construction activities within sixty (60) days of receipt of such notice, and shall complete the project pursuant to the contract documents. Each bidder is responsible for inspecting the Project Site(s) and for reading and being thoroughly familiar with the Contract Documents and Specifications. The Tippecanoe County Board of Commissioners reserves the right to reject any Bid or all Bids, or to accept any Bid or Bids, or to make such combination of Bids as may seem desirable, and to waive any and all informalities in the bidding. By the order of the Board of Commissioners, Tippecanoe County, Indiana.
GC Bidding
Water / Sewer
$200,000.00
Public - County
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 08 - Openings
Division 09 - Finishes
Division 11 - Equipment
Division 12 - Furnishings
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 15, 2025
May 15, 2025

Multiple Locations, Lafayette, IN
Related To This Project
Lafayette, IN
Bid Date: Apr 04 2025
Lafayette, IN
Bid Date: Apr 08 2025
Lafayette, IN
Bid Date: Apr 02 2025
Lafayette, IN
Bid Date: Mar 19 2025
Lafayette, IN
Bid Date: Apr 03 2025
Lafayette, IN
Bid Date: Mar 05 2025
Lafayette, IN
Bid Date: Mar 05 2025
Lafayette, IN
Bid Date: Mar 18 2025
Lafayette, IN
Bid Date: Mar 06 2025
Lafayette, IN
Bid Date: Feb 24 2025
Lafayette, IN
Bid Date: Feb 27 2025
Lafayette, IN
Bid Date: Sep 22 2020
Lafayette, IN
Bid Date: Feb 04 2025
Lafayette, IN
Bid Date: Apr 25 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.