Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published May 19, 2025 at 8:00 PM
Updated May 22, 2025
Site work for a water / sewer project in Nicholasville, Kentucky. Completed plans call for site work for a water / sewer project.
The CONSULTANT shall perform professional services as hereinafter stated which shall include but is not limited to customary civil, geotechnical, structural, mechanical, electrical engineering, and programming services as related to the Investigation / Design for West Hickman WWTP ASH Tank Blower Improvements Project. The CONSULTANT will evaluate different options for blowers for the Aerated Sludge Holding Tanks at The West Hickman Creek Wastewater Treatment Plant. Chapter 9 (Aerated Sludge Holding Tanks) of the Operations and Maintenance Manual for West Hickman WWTP from 2000, is included in Appendix A. While reviewing the O&M Manual, please note that ASH Tanks 3 and 4 are the only 2 tanks used. They were covered to be able to control odors from the sludge. Blowers 1 and 3 (60 HP Blowers) are out of service and Blowers 5 and 6 (150 HP Blowers) can, currently, only be used one at a time due to piping limitations. The current layout of the Blowers and Tanks are shown in the drawings included in Appendix B. The current blower arrangement does not allow operations staff the aeration capacity needed. Staff would like to maintain a DO of 2 mg/l in ASH Tanks 3 and 4. A contractor was hired to run parallel piping for the 150 HP Blowers. Once that project is complete staff should be able to maintain a DO of 2mg/l in each tank. The parallel piping is complete, and staff have been collecting data. West Hickman ASH Tank Blower Improvements Questions Deadline: 4/2/2025 04:00 PM (ET)
Post-Bid
Water / Sewer
$300,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 17, 2025
May 12, 2025
645 W Hickman Plant Rd, Nicholasville, KY
Related To This Project
Nicholasville, KY
Bid Date: Apr 17 2025
Nicholasville, KY
Bid Date: Apr 17 2025
Nicholasville, KY
Bid Date: Apr 07 2025
Nicholasville, KY
Bid Date: May 19 2025
Nicholasville, KY
Bid Date: Jun 02 2025
Nicholasville, KY
Bid Date: Jun 17 2025
Nicholasville, KY
Bid Date: Jul 24 2025
Nicholasville, KY
Bid Date: Jul 24 2025
Nicholasville, KY
Bid Date: Apr 16 2025
Nicholasville, KY
Bid Date: Mar 20 2025
Nicholasville, KY
Bid Date: Mar 18 2025
Nicholasville, KY
Bid Date: Mar 06 2025
Nicholasville, KY
Bid Date: Feb 20 2025
Nicholasville, KY
Bid Date: Mar 04 2025
Nicholasville, KY
Bid Date: Feb 13 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed