BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 21, 2026 at 8:00 PM

Updated May 20, 2026

Demolition, site work, renovation and addition to a mixed-use development in Aurora, Illinois. Completed plans call for the addition of a educational facility; for the renovation of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

Focus Area 1 - Comprehensive Renovation at Waubonsie Valley High School: Waubonsie Valley High School is approximately 590,000 square feet and has approximately 2,500 students. The scope for this school will be to renovate the entire school with a focus on improving learning environments, air quality, building systems, athletic complex, health/life safety, site upgrades, and energy efficiency. The estimated budget for these renovations is $130,000,000. Focus Area 2 - Comprehensive Renovation and Additions at Neuqua Valley High School and Repurposing Birkett Freshman Center: Neuqua Valley High School is approximately 450,000 square feet and has approximately 2,300 students currently. The scope for this school will be to renovate the entire school with a focus on improving learning environments, air quality, building systems, health/life safety, site upgrades, and energy efficiency. There will also be additions of approximately 49,000 square feet for expanded support space and additional classrooms to support bringing 800 freshman back to the school from the Birkett Center. The Birkett Center is approximately 140,000 square feet and will be repurposed and renovated to house the STEPS program, the credit recovery program, some CTE/STEM space and professional development spaces. The estimated budget for these renovations and additions is $120,000,000. Focus Area 3 - Middle School Renovations: The focus of this effort will be at the seven middle schools with the majority of the renovations and additions to be completed at Gregory and Hill Middle School. Additional scope will include the secured vestibules and improvements at select elementary schools. This scope will be completed after Focus Areas 1 and 2 are completed or near completion. As of March 17, 2026, a construction manager has been selected. Additional details regarding the firm, construction schedule, and projected completion timeline have not yet been released.

Award

Educational

$420,000,000.00

Public - County

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
613
Active Projects
290
Bidding Soon
4,802
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

June 1, 2026

Project location map

Multiple Locations, Aurora, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.